Maybe the shire is acting on engineering advice that the re seal needs to be done ASAP. Anyone have first hand knowledge as to the condition of the runway? Was there cracking, rutting or other faults?
The required level of notice for a closure for planned works is 14 days but where airlines are concerned you would normally give as much notice as possible.