PPRuNe Forums - View Single Post - Fuel tanks installation of AW139
View Single Post
Old 25th Oct 2018, 17:23
  #8 (permalink)  
Sir Korsky
 
Join Date: Sep 2011
Location: USA
Age: 55
Posts: 466
Received 43 Likes on 29 Posts
The flange connector between the bladders is installed midway to ensure a nominal amount of fuel is available after a fuel cell puncture in the opposing tank. Gives you 30 mins-ish to get on the ground. Nice design, even considering the dreaded gray fuel on the schematic !
Sir Korsky is offline