Very strange that if the fire handles for #2 and #3 engines were pulled that those engines apparently ran at full power for 20 minutes after the crash and #1 ran for 40 minutes!?
Perhaps the fire/rescue team pulled the two fire handles?
Also I would think that planing a flight into a rather small airport with a not so long runway with an inoperative anti skid system was perhaps not a wise idea.