PPRuNe Forums - View Single Post - QANTAS long haul EBA
View Single Post
Old 14th Aug 2018, 10:02
  #19 (permalink)  
Tankengine
 
Join Date: May 2001
Location: Sydney
Age: 60
Posts: 1,542
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by Keg
767 pilots found out five months before the fleet dead stopped what was to be done with them. The final 744 retirement is still at least two years away. No one is likely to be demoted as a result of this RIN. People are getting wound up way too early.
Just because they stuffed the last RIN does not mean we should accept it again.
The EBA negotiations for the timespan of any 747 RIN has already begun. (Negotiated by the same team, more or less, who negotiated the 787 contract)
Now is certainly the time to point out to both sets of negotiators to get this right and not get into a confrontational situation.
QF managers have differing opinions as to what the EBA RIN process means. One manager is hoping pilots will do reduced lines (at reduced pay) until the end to stop multiple RINs - pigs arse!! 160hrs min thank you.
The company will do anything to reduce the costs of the 747 fleet reduction, (and secure thrir bonuses)’ our job is to ensure that AIPA suck the very best deal out of them and not accept what has happened before!
Tankengine is offline