PPRuNe Forums - View Single Post - Manchester 24L
Thread: Manchester 24L
View Single Post
Old 9th Aug 2001, 21:11
  #1 (permalink)  
sky9

Keeping Danny in Sandwiches
 
Join Date: May 1999
Location: UK
Age: 76
Posts: 1,294
Likes: 0
Received 0 Likes on 0 Posts
Post Manchester 24L

Be very careful at Manchester using the 24L runway. The declared full runway length is measured from the VA holding point which is grey concrete however the black topped surface and piano keys marking the threshold are abeam the VB holding point, about 800ft from memory) further down the runway.

It would have been better if the blacktop had commenced at the beginning of the Take Off Run.

Edited to correct holding point errors identified by cossack & andymac.

[ 13 August 2001: Message edited by: sky9 ]
sky9 is offline