AGB Change - Engine Run
Joined: May 2008
Posts: 451
Likes: 0
From: Scotland
You will find gearbox replacement procedure in MM 72-00-06 and run procedure afterwards in MM 71-00-00 adj/test. Not familiar with CFM56 but doubt if there is any time given - it will basically be a function test of everything on the gearbox plus leak check. At a guess 20 mins or so. It will probably require 2 starts - IDG will require disconnect and run after reconnect.





