Go Back  PPRuNe Forums > Flight Deck Forums > Tech Log
Reload this Page >

A320 center tank pumps at "Engine Start"

Wikiposts
Search
Tech Log The very best in practical technical discussion on the web

A320 center tank pumps at "Engine Start"

Thread Tools
 
Search this Thread
 
Old 12th Nov 2013, 16:45
  #1 (permalink)  
Thread Starter
 
Join Date: Sep 2003
Location: GRR
Posts: 16
Likes: 0
Received 0 Likes on 0 Posts
A320 center tank pumps at "Engine Start"

Hello,

referring to the diagram FCOM DSC 28-10-30 p3, with fuel in the center tank,

how do you understand " 2 min AFTER ENG START " ?

For each center tank pump, do the two minutes start when their related master engine switch is set to ON position ? In that case, it would mean that engine start is done with fuel from the center tank.

Or

Later ?
tolosan is offline  
Old 13th Nov 2013, 08:06
  #2 (permalink)  
 
Join Date: Jul 2010
Location: Mumbai
Age: 34
Posts: 120
Likes: 0
Received 0 Likes on 0 Posts
As per Technical Training Manual :

"During the engine start sequence and in the following 2 minutes, the center tank pumps run regardless of the slat position. When running, center tank pumps have priority for engine supply over wing tank pumps. After this delay, center tank pumps stop because slats are still extended."
gAMbl3 is offline  
Old 13th Nov 2013, 10:23
  #3 (permalink)  
Thread Starter
 
Join Date: Sep 2003
Location: GRR
Posts: 16
Likes: 0
Received 0 Likes on 0 Posts
Thanks gAMbl3, it's a lot clearer than the FCOM.

Can you confirm when the eng start sequence ends according to your manual ?
tolosan is offline  
Old 13th Nov 2013, 11:39
  #4 (permalink)  
 
Join Date: Jan 2008
Location: South, near the end of the world.
Age: 50
Posts: 285
Received 1 Like on 1 Post
The starting sequence is ended when the grey background on the N2 indication disappears.
PRO-NOR-SOP-08 P2/4
cosmiccomet is offline  
Old 13th Nov 2013, 13:50
  #5 (permalink)  
Thread Starter
 
Join Date: Sep 2003
Location: GRR
Posts: 16
Likes: 0
Received 0 Likes on 0 Posts
Yes and stated in DSC-70-90 :

(6) HP rotor speed N2 The numbers are normally green. (During start sequence, they are green on a grey background).
tolosan is offline  
Old 16th Nov 2013, 11:17
  #6 (permalink)  
 
Join Date: Feb 2008
Location: 39.000 ft above the Earth
Posts: 12
Likes: 0
Received 0 Likes on 0 Posts
In any case, when the ECAM Memo appears the test of the centertank pumps is completed, and the 2 minutes have passed

DSC-31-15 P 5/8
Jetdriver_JAT is offline  
Old 16th Nov 2013, 21:46
  #7 (permalink)  
 
Join Date: Mar 1999
Location: KDEN
Posts: 220
Likes: 0
Received 0 Likes on 0 Posts
The starting sequence is ended when the grey background on the N2 indication disappears.
Indeed, but the time related items (2:00 center tank feeding, 0:30 pack valves) count forward from the start valve closing @ 50% N2.
Cardinal is offline  
Old 18th Nov 2013, 20:00
  #8 (permalink)  
Thread Starter
 
Join Date: Sep 2003
Location: GRR
Posts: 16
Likes: 0
Received 0 Likes on 0 Posts
Hello Cardinal,

For the pack flow control valve, the FCOM is clear but nothing is mentioned for the center tank pumps.

What is your airbus reference for the 50% N2 as time check for the two minutes ?
tolosan is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.