Thread Tools
 
Search this Thread
 
Old 12th November 2013 | 16:45
  #1 (permalink)  
Thread Starter
 
Joined: Sep 2003
Posts: 16
Likes: 0
From: GRR
A320 center tank pumps at "Engine Start"

Hello,

referring to the diagram FCOM DSC 28-10-30 p3, with fuel in the center tank,

how do you understand " 2 min AFTER ENG START " ?

For each center tank pump, do the two minutes start when their related master engine switch is set to ON position ? In that case, it would mean that engine start is done with fuel from the center tank.

Or

Later ?
tolosan is offline  
Reply
Old 13th November 2013 | 08:06
  #2 (permalink)  
 
Joined: Jul 2010
Posts: 120
Likes: 0
From: Mumbai
As per Technical Training Manual :

"During the engine start sequence and in the following 2 minutes, the center tank pumps run regardless of the slat position. When running, center tank pumps have priority for engine supply over wing tank pumps. After this delay, center tank pumps stop because slats are still extended."
gAMbl3 is offline  
Reply
Old 13th November 2013 | 10:23
  #3 (permalink)  
Thread Starter
 
Joined: Sep 2003
Posts: 16
Likes: 0
From: GRR
Thanks gAMbl3, it's a lot clearer than the FCOM.

Can you confirm when the eng start sequence ends according to your manual ?
tolosan is offline  
Reply
Old 13th November 2013 | 11:39
  #4 (permalink)  
15 Anniversary
 
Joined: Jan 2008
Posts: 292
Likes: 8
From: South, near the end of the world.
The starting sequence is ended when the grey background on the N2 indication disappears.
PRO-NOR-SOP-08 P2/4
cosmiccomet is online now  
Reply
Old 13th November 2013 | 13:50
  #5 (permalink)  
Thread Starter
 
Joined: Sep 2003
Posts: 16
Likes: 0
From: GRR
Yes and stated in DSC-70-90 :

(6) HP rotor speed N2 The numbers are normally green. (During start sequence, they are green on a grey background).
tolosan is offline  
Reply
Old 16th November 2013 | 11:17
  #6 (permalink)  
 
Joined: Feb 2008
Posts: 12
Likes: 0
From: 39.000 ft above the Earth
In any case, when the ECAM Memo appears the test of the centertank pumps is completed, and the 2 minutes have passed

DSC-31-15 P 5/8
Jetdriver_JAT is offline  
Reply
Old 16th November 2013 | 21:46
  #7 (permalink)  
 
Joined: Mar 1999
Posts: 220
Likes: 0
From: KDEN
The starting sequence is ended when the grey background on the N2 indication disappears.
Indeed, but the time related items (2:00 center tank feeding, 0:30 pack valves) count forward from the start valve closing @ 50% N2.
Cardinal is offline  
Reply
Old 18th November 2013 | 20:00
  #8 (permalink)  
Thread Starter
 
Joined: Sep 2003
Posts: 16
Likes: 0
From: GRR
Hello Cardinal,

For the pack flow control valve, the FCOM is clear but nothing is mentioned for the center tank pumps.

What is your airbus reference for the 50% N2 as time check for the two minutes ?
tolosan is offline  
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off