Notices
Tech Log The very best in practical technical discussion on the web

DCL or PDC

Old 11th September 2012 | 08:42
  #1 (permalink)  
Thread Starter
 
Joined: Jul 2011
Posts: 87
Likes: 0
From: Inter Nations
DCL or PDC

Hey chaps,

My company provides info whether the airport uses DCL or PDC. But what are precisely the differences. Jepp text gives little info.

Anyone?
DutchOne is offline  
Reply
Old 11th September 2012 | 09:16
  #2 (permalink)  
 
Joined: Jul 2010
Posts: 188
Likes: 0
From: LHR
Same thing. Departure Clearance (DCL) over most of the World, Pre-Departure Clearance (PDC) in America.
HPbleed is offline  
Reply
Old 11th September 2012 | 10:58
  #3 (permalink)  
 
Joined: Oct 2007
Posts: 175
Likes: 0
From: sh!# hole
DCL is a clearance direct from ATC sent to your ACARS and does not require a read back on clearance delivery.
PDC comes from a different source and requires a PDC read back on clearance delivery.

Oz
oz in dxb is offline  
Reply
Old 11th September 2012 | 11:29
  #4 (permalink)  
9.G
 
Joined: Dec 2007
Posts: 559
Likes: 0
From: paradise
oz in dxb, disagreed. Never read back a PDC unless specifically instructed to do so, mostly in China. There's an acceptance function with confirmation.
9.G is offline  
Reply
Old 11th September 2012 | 15:03
  #5 (permalink)  
9.G
 
Joined: Dec 2007
Posts: 559
Likes: 0
From: paradise
http://www.faa.gov/air_traffic/publi...m/aim0502.html

EUROCONTROL - Overview
9.G is offline  
Reply
Old 11th September 2012 | 15:39
  #6 (permalink)  
9.G
 
Joined: Dec 2007
Posts: 559
Likes: 0
From: paradise
Applicable to Operators affected by the European Data Link Services Implementing Rule

on this accord I wonder how some operators intent to accomplish read backs for:
Some Operators may have received an email signed by Eurocontrol and DFS Deutsche Flugsicherung in mid July 2012 (Refer to Eurocontrol e-mail) about changes in CPDLC operations over Maastricht and Karlsruhe Upper Airspace Controls (UACs). These changes are:

The discontinuation of the Voice Read Back (VRB) procedures from November 15, 2012. This requires Protected Mode CPDLC (PM-CPDLC) capable avionics. Aircraft without PM-CPDLC (Refer to Note 2 below) will not be able to log on to ATC centers via datalink.
The requirement to fill in the 24-bit address in the Filed Flight Plan (FPLN) from September 27, 2012. The 24-bit address is also called the Mode S address, aircraft address, or aircraft ICAO code.
Interesting times no more chit chat with the boys on the ground, nor everywhere yet but it's coming.
9.G is offline  
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread

Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.