Cat 1 RVR mid and stop
Thread Starter
Cat 1 RVR mid and stop
Ok so Cat 1 is 550m and the mid and stop are only required if relevant. My question is:
If relevant what are the mid and stop RVR requirements for cat 1?
Are they both 550m or 125/75 ?
Does anyone have a reference, I can not find it anywhere.
Cheers
If relevant what are the mid and stop RVR requirements for cat 1?
Are they both 550m or 125/75 ?
Does anyone have a reference, I can not find it anywhere.
Cheers
Join Date: Jan 2007
Location: Budapest
Age: 53
Posts: 17
Likes: 0
Received 0 Likes
on
0 Posts
I would go for EU-OPS 1.405:
Note:
(f) The touch-down zone RVR is always controlling. If reported and relevant, the mid point and stop end RVR are also controlling. The minimum RVR value for the mid-point is 125 m or the RVR required for the touch-down zone if less, and 75 m for the stop-end. For aeroplanes equipped with a roll-out guidance or control system, the minimum RVR value for the mid-point is 75 m.
Note:
“Relevant”, in this context, means that part of the runway used during the high speed phase of the landing down to a speed of approximately 60 knots.