Go Back  PPRuNe Forums > Flight Deck Forums > Tech Log
Reload this Page >

What is happening about the Qantas A380 at Singapore

Wikiposts
Search
Tech Log The very best in practical technical discussion on the web

What is happening about the Qantas A380 at Singapore

Thread Tools
 
Search this Thread
 
Old 30th Dec 2010, 09:27
  #1 (permalink)  
Thread Starter
 
Join Date: Jul 2006
Location: Australia
Posts: 312
Likes: 0
Received 0 Likes on 0 Posts
What is happening about the Qantas A380 at Singapore

Does anyone understand the repair program for this airplane.

Is particularly the mainplane repair or replacement likely to be a big job and can it be done at Singapore.

If the airframe is to be returned to France how will they get it there and how long before it is back in service
herkman is offline  
Old 30th Dec 2010, 11:05
  #2 (permalink)  
 
Join Date: Jul 1998
Location: UK
Posts: 59
Likes: 0
Received 0 Likes on 0 Posts
Probably for the Gas Axe from what has been mentioned in the last couple of weeks.
Skytrucker is offline  
Old 30th Dec 2010, 15:40
  #3 (permalink)  
 
Join Date: Jul 2007
Location: home
Posts: 100
Likes: 0
Received 0 Likes on 0 Posts
Tiger, (the beer company, not the airline) is about to make a bid for it. They just have to confirm how much alu is actualy in there.
clevlandHD is offline  
Old 30th Dec 2010, 15:41
  #4 (permalink)  
 
Join Date: Sep 2010
Location: Double Oak, Texas
Age: 71
Posts: 180
Likes: 0
Received 0 Likes on 0 Posts
No clue about the repair program for the beast; but a repair bill of near US$70 million has been published
Qantas A380 repair bill to cost US$70m | Australian Aviation Magazine
SKS777FLYER is offline  
Old 30th Dec 2010, 16:27
  #5 (permalink)  
bearfoil
Guest
 
Posts: n/a
One thinks two powerplants will need to be replaced with new. Brown goo in an engine producing power most likely utterly destroyed #1's internals. That's 40 million plus, prior to entertaining a new wing. Even if possible to repair, one also thinks the damaged wing will not be retained. That's another 30 million, and then add up the damage done to Fuselage, Empennage, etc. Not unusual for an insuror to underestimate, it too has stockholders, and RR may face some counter claim by this firm. The lack of disclosure to the players 'softens' AON's indemnity, this will take a very long time to sort, IMO
 
Old 30th Dec 2010, 18:15
  #6 (permalink)  
 
Join Date: Aug 2007
Location: London, New York, Paris, Moscow.
Posts: 3,632
Likes: 0
Received 0 Likes on 0 Posts
If the airframe is to be returned to France how will they get it there and how long before it is back in service
It's not inconceivable that it could be stripped right out and taken down into it's original sections and barged back? That's how they move them about pre construction.

Hmm job on boys
glad rag is offline  
Old 30th Dec 2010, 18:29
  #7 (permalink)  
 
Join Date: Jan 2008
Location: On the lake
Age: 82
Posts: 670
Received 0 Likes on 0 Posts
One thinks two powerplants will need to be replaced with new
I would guess that the $70M repair cost quoted by AON only covers the bare airframe. As the engines were apparently supplied on a power-by-the-hour basis to QF, they're probably sold to a separate leasing company and leased back to RR; insurance coverage could be supplied under a separate contract.
twochai is offline  
Old 30th Dec 2010, 19:42
  #8 (permalink)  
Nemo Me Impune Lacessit
 
Join Date: Jun 2004
Location: Derbyshire, England.
Posts: 4,096
Received 0 Likes on 0 Posts
What the final outcome is may depend on how the various insurable elements of the risk are spread about. It is quite likely that all QANTAS hull insurance is first placed with an Australian underwriter who will retain about 1% and re-insure the rest out, probably a large lump in Lloyd's and the companies in London. Because the Australian retention is likely to be very small underwriting control will go to the leading re-insurance company or syndicate, the total risk will be spread among dozens of underwriters who will have agreed to follow the leaders.

From the hull insurance point of view the underwriters are likely to look at the total cost of repair and getting the aircraft back in the air, if the engineering and logistical cost is less than a new airframe then that is what the underwriters are likely to agree to. The hull insurers may try to recover some of their costs from RR, (actually RRs insurers), and the amount they attempt to recover will depend on the amount RR are held to blame. As some of the underwriters who insure QANTAS hulls are also likely to insure RR the claims behind the scenes could go on for years!

Not sure how the Loss of Use and Loss of Revenue will be dealt with or which policy that will fall under but if it comes under the hull policy then those costs will be included in the engineering and logistical costs.

Some where here on PPRuNe I'm sure there are both claims brokers and underwriters who can give a much more definitive appraisal and a more informed opinion as to how this one will play out. I would not expect write-off to be an option, but if it is I imagine that either QF or SIA will buy the salvage.
parabellum is offline  
Old 30th Dec 2010, 19:51
  #9 (permalink)  
 
Join Date: Jun 2007
Location: Marion, South Australia
Age: 80
Posts: 183
Likes: 0
Received 0 Likes on 0 Posts
Perhaps if the USN has a Nimitz class aircraft carrier that is due to sail Singapore to France in the forseeable future!!!!!!

Or Mammoet Website > Mammoet Corporate > Asia - Pacific > ASIA-PACIFIC might get a call to 'barge' it back to France.
mmciau is offline  
Old 30th Dec 2010, 22:57
  #10 (permalink)  
bearfoil
Guest
 
Posts: n/a
I have two questions. Why would SIA or Qantas want to purchase salvage? Also, a very important piece is left out, and related to why the carrier would not want the salvage, imo. Insult to Marque. Perhaps not indemnified by any carrier, but a real concern to Qantas, whose losses go well beyond Airframe. Litigable, and ultimately an unknown, but Power by the Hour comes with ghosts. The amount would be decided by Lawyers and MBA's, not to mention phD's in Marketing. This incident has long legs.
 
Old 30th Dec 2010, 23:18
  #11 (permalink)  
 
Join Date: Feb 2007
Location: Down Under
Posts: 124
Likes: 0
Received 0 Likes on 0 Posts
It will be fixed in SIN. It probably won't be in the air until mid-late 2011.
Nepotisim is offline  
Old 31st Dec 2010, 00:21
  #12 (permalink)  
Nemo Me Impune Lacessit
 
Join Date: Jun 2004
Location: Derbyshire, England.
Posts: 4,096
Received 0 Likes on 0 Posts
Probably the salvage of the interior would only be of interest to QF as it is all to their custom fit in the cabin. Other major components would probably come cheap as, once they have sold the salvage, the insurers don't have to worry about disposal so are likely to let it go for the best offer, that is where SQ may take an interest as they have disposal facilities and a major engineering facility to do the dismantling, could be a joint affair. Insult to Marque or not, money is money and it will be a cheap source of spares for someone, if it is totaled, which Nepotism says it won't.

I agree, by the time the litigation is over we will all be several years older!

(Make a lovely cabin crew or fire crew trainer though!!!)
parabellum is offline  
Old 31st Dec 2010, 10:26
  #13 (permalink)  
 
Join Date: Sep 2007
Location: London
Posts: 581
Likes: 0
Received 3 Likes on 3 Posts
I see that a repair bill of UD$70m upwards has been quoted. Looking from the other direction, if the airframe is robbed for spares, what would they be likely be worth? Are we looking at $10 of millions? And as a matter of any ideas as to what proportion of the frame could be recovered by volume and mass?
Peter47 is offline  
Old 31st Dec 2010, 12:25
  #14 (permalink)  
bearfoil
Guest
 
Posts: n/a
Too bad beer cans are made of aluminium, instead of CRP, wait.............
 
Old 31st Dec 2010, 17:50
  #15 (permalink)  
 
Join Date: Jul 2009
Location: Not far from a big Lake
Age: 82
Posts: 1,454
Likes: 0
Received 0 Likes on 0 Posts
So why wouldn't they, repair some wire bundles, repair some damaged components, bolt on a few new engines, put in some temporary structural repairs in the wing and ferry the thing back to Airbus for full repair?
It isn't like it the airframe is broken in little pieces or burnt up.

It flew into Singapore-why shouldn't it fly out?

I've ferried damaged aircraft-no big deal except you might have some additional flight restrictions/procedures.
Machinbird is offline  
Old 11th Dec 2011, 11:13
  #16 (permalink)  
 
Join Date: Aug 2008
Location: in the bunk
Posts: 204
Likes: 0
Received 0 Likes on 0 Posts
Any updates on the fate of this 380?
three eighty is offline  
Old 11th Dec 2011, 11:26
  #17 (permalink)  
 
Join Date: Mar 2010
Location: on a blue balloon
Posts: 2
Likes: 0
Received 0 Likes on 0 Posts
Nancy Bird Walton

"Qantas CEO Alan Joyce has told media that the Airbus A380 involved in the engine explosion and emergency landing at Singapore last year will return to service with the airline in February or March 2012.

The aircraft has been stranded in Singapore since one of its Rolls-Royce Trent 900 engines disintegrated shortly after takeoff from Singapore and its subsequent safe landing on November 4. The uncontained failure severely damaged the aircraft’s left wing spar and numerous wiring harnesses and subsystems.

The aircraft, VH-OQA Nancy Bird Walton is currently being repaired in Singapore by Qantas, Airbus and Singapore Airlines staff. Joyce said the wing spar had been replaced and the aircraft would be taken off jacks in November and conduct a comprehensive flight test campaign before returning to service."
oldchina is offline  
Old 12th Dec 2011, 02:03
  #18 (permalink)  
 
Join Date: Feb 1998
Location: Formerly of Nam
Posts: 1,595
Likes: 0
Received 0 Likes on 0 Posts
Seventy million bucks?

If the repair costs are that much why not just turn the bloody
thing into a hangar queen?
Slasher is offline  
Old 12th Dec 2011, 03:33
  #19 (permalink)  
Nemo Me Impune Lacessit
 
Join Date: Jun 2004
Location: Derbyshire, England.
Posts: 4,096
Received 0 Likes on 0 Posts
$70mil as opposed to its value, if they were $300mil new, with depreciation over ten years, this one would still be worth $230mil? Still a bit expensive for just training apprentices?
parabellum is offline  
Old 12th Dec 2011, 03:47
  #20 (permalink)  
 
Join Date: Mar 2002
Location: Florida
Posts: 4,569
Likes: 0
Received 1 Like on 1 Post
Seventy million bucks?

If the repair costs are that much why not just turn the bloody
thing into a hangar queen?
It's an insurrance carrier call and not an airline call.

It get's really dicy on older equipment where the fleet need would just as soon do without, or, spooked customers refuse to ride on a plane that was so unlucky.

Sometimes some interesting salvage operations happen where the plane is deemed a hazard to ships or other planes and it needs to have emergency trimming of the bits in the way using explosive charges or cutting torches rather than undoing those hard to get at bolts
lomapaseo is offline  


Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.