Go Back  PPRuNe Forums > Flight Deck Forums > Tech Log
Reload this Page >

A320 Low Visibility Briefing

Wikiposts
Search
Tech Log The very best in practical technical discussion on the web

A320 Low Visibility Briefing

Thread Tools
 
Search this Thread
 
Old 28th Dec 2009, 20:04
  #1 (permalink)  
Thread Starter
 
Join Date: Aug 2009
Location: germany
Posts: 2
Likes: 0
Received 0 Likes on 0 Posts
A320 Low Visibility Briefing

Hi,
I`m repeating the low visibility operations of my A320 rating at the moment.
Therefore I want to make a "frame" for the briefing of a CAT2/3 approaches.
It would be nice, if someone could help me out with it.
At the moment it looks like this:
-seating pos. & cockpit lights
-destination & alternate weather
-airfield and operational status CATII/III
-a/c system statuas à ECAM
-approach procedure
-callouts

1000ft RA checked
below 1000ft RA à AH 100ft for any malefunction GA
500ft RA checked
350ft RA LAND
200ft RA and below AUTOLAND warning à GA
ckeck 40ft RA FLARE
--> thereafter the normal FMGC briefing with minimum and GA....
Than you!
fueltonoiseconverter is offline  
Old 28th Dec 2009, 22:10
  #2 (permalink)  
 
Join Date: May 2009
Location: somewhere in the middle
Posts: 338
Likes: 0
Received 1 Like on 1 Post
The way I remember it for CatII ops is 4A's, a B and a C:

Aircraft? (is a/c CatII capable, autopilot serviceable, everyone sat as they should be, lights set as appropriate?)
Aircrew? (Both crew CatII current?)
Airfield? (Airfield have a serviceable CatII ILS, LVPs in force? Wx?)
Alternate? (Airfield above CatI minima, weather?)

Brief the plate as you usually would, making sure the other guy is aware of the DH and Vis needed, Cat I reversion, and LVP runway exits / taxi routes.

Finally, review the Calls that you will make, and what you are expecting from the other guy, including the actions after a go-around, and who is PF/PNF at which point.

Now, this is for turboprop Cat II, but might be a starting point for your needs? I feel a mnemonic helps you to remember everything you need to, especially when you are still learning.

Good luck!

TTR
thetimesreader84 is offline  
Old 29th Dec 2009, 16:50
  #3 (permalink)  
 
Join Date: Nov 2002
Location: Dublin
Posts: 652
Likes: 0
Received 0 Likes on 0 Posts
Mention the point at which the approach ban or Cat 1 reversion may happen. As usually the FO flys the approach and the Cpt lands, sort out the trust lever hand over, nothing worse than landing holding hands!
Also, what you expect to see at decision, lights etc
Kirks gusset is offline  
Old 1st Jan 2010, 19:14
  #4 (permalink)  
The Bumblebee
 
Join Date: Jul 1999
Location: Inside the shiny tube.
Posts: 333
Likes: 0
Received 0 Likes on 0 Posts
This is from our company manual


TASK SHARING DURING CAT II / III A / B APPROACH AND LANDING.

The work load is distributed in such a way that the PF primary task are supervision and decision making, and the PNF primary task is monitoring, operations of the automatic system.

- PNF will stay head down throughout the approach, roll out and in case of Go-Round upto acceleration altitude or landing until roll-out is completed.
- PNF will call 1000’ and 500' on pressure altitude (Calls barometric height as required)
- PNF will monitor auto calls by 400' and if mo auto calls you will call 100' above and minimums.
- PNF will monitor FMA and calls mode changes as required


CAT II/III A/B BRIEFING

FLIGHT PREPARATION

Pre-flight Preparation

- Review "NOTAMS" to make sure that the destination airport still needs visual or non-visual aids as per CAT-II or CAT-IlIA requirements.
- Aircraft Status -Check the required equipment for CAT-II or CAT-IIIA approaches are operative -Check entry in PDR Book under "Acceptance" MEL.
- Crew Qualification and Currency must be reviewed (Both Captain and First Officer must be qualified and current).
- Weather information. Check weather conditions at destination and alternates. Required RVR values must be available for CAT II/III approaches. The selected alternate must have weather conditions equal to or better than CAT I.
- Fuel Planning
-Additional extra fuel should be considered for possible approach delays.

Approach Preparation
- The briefing should include normal items as for any IFR arrivals and in addition, the following subjects should be covered prior to the approach briefing.

1) CHECK THE WEATHER with ATC & If CAT-II/IlIA operation is in progress.
2) REVIEW MINIMA (weather for downgrading conditions).
3) Discuss ALERT HEIGHT, if applicable.
4) CREW QUALIFICATION (Both Commander & First Officer).
5) AIRCRAFT SYSTEM "STATUS" AND CAPABILITY (STBY HORIZON -NO RED FLAG).

6) ARM AUTO-BRAKES (LOW / MED).
7) FUEL STATUS (Sufficient for slow traffic and diversion).
8) DO NOT MAKE ANY SWITCHING BELOW 1000 ft pressure altitude'. Any failure or degrading conditions below 1000' AGL to DH (OR Alert Height, if applicable) requires a GO-AROUND, unless visual reference has been established. For a failure below Alert Height the Pilot may continue to DH except in case of "AUTOLAND" light flashing.

9) AUTOLAND OR MANUAL LAND (NOTE: AP's OFF not lower than 80 ft. RA -In case of CAT II). FOR CAT III A auto land is mandatory.

10) ADJUST SEATS WITH the RED & WHITE BALLS.
11) DON'T USE STROBES & LANDING lights especially at night (dome light OFF).

12) BRIEF REVIEW OF TASK SHARING -YOU will remain heads down (CM1 is PF and CM2 is PNF).

13) Appropriate IFR arrival and Approach Chart Briefing to be carried out and Go- around procedure to be reviewed.

14) MINlMA CHANGES DUE TO DOWN GRADING CONDITIONS, STATUS OF GROUND INSTALLATION AND / OR AIR-BORNE EQUIPMENT.


DOWNGRADING CONDITIONS

Above 1 000 ft:
Downgrading conditions
a) Downgrading from CAT III TO CAT II is permitted only if:
-ECAM actions are completed
-RVR is at least equal to CAT II minima
-briefing is amended to include CAT II procedure and DH
-decision to downgrade is completed above 1000 ft AGL

b) Downgrading from CAT II to CAT I permitted only if:

-ECAM actions are completed -atleast one FD is available
-RVR is at least equal to CAT I minima
-briefing is amended to include CA T1 procedure and DH
-the decision to downgrade is completed above 1000 ft AGL

Below 1000 ft and above DH (for CAT II or CAT III SINGLE) or above AH (for CAT III DUAL) a go-around must be performed in case of:
-ALPHA FLOOR activation
-loss of AP (cavalry charge)
-downgrading of capability (clic, clic, clic)
-amber caution (single chime)
-engine failure
DesiPilot is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.