Boeing 767 Performance

Old 12th September 2007 | 09:55
  #1 (permalink)  
Thread Starter
 
Joined: Sep 2006
Posts: 148
Likes: 0
From: London
Boeing 767 Performance

Am looking for advice on B767 Take Off performance. I work at a small airport who are looking to extend their runway with a view to enticing transatlantic services. I've been tasked with the job of producing some performance figures for the 767 to establish what the required TOW would be for transatlantic and how long our runway would need to be to allow the aircraft to take off at that weight.

For commercial reasons, we don't want to talk directly to any operators at this stage (feasibility), however I'm struggling to get hold of any info. Is this a lost cause (i.e. do we have to ask an airline for the info), or is there info available for use.

many thanks.

Dan
danieloakworth is offline  
Reply
Old 12th September 2007 | 10:13
  #2 (permalink)  
25 Anniversary
 
Joined: Nov 1999
Posts: 647
Likes: 19
From: East side of OZ
G'day Dan,

Why don't you ask these guys,

http://boeing.com

They'd know for sure.

Regards,
BH.
Bullethead is online now  
Reply
Old 12th September 2007 | 10:39
  #3 (permalink)  
 
Joined: Jul 2004
Posts: 513
Likes: 0
From: Sydney NSW
more specifically

http://www.boeing.com/commercial/airports/acaps/767.pdf
enicalyth is offline  
Reply
Old 13th September 2007 | 13:17
  #4 (permalink)  
Thread Starter
 
Joined: Sep 2006
Posts: 148
Likes: 0
From: London
Excellent, just what I needed, many thanks.
danieloakworth is offline  
Reply
Old 13th September 2007 | 15:45
  #5 (permalink)  
100 Countries Visited
25 Anniversary
 
Joined: Sep 1999
Posts: 5,552
Likes: 25
From: ME
The airport characteristics document is excellent, but remember that it doesnt account for takeoff obstacles nor slope. Considering the amount of money that is involved in extending a runway, it would be sensible to contract a professional company to do the analysis.

Mutt
mutt is offline  
Reply
Old 13th September 2007 | 21:40
  #6 (permalink)  
20 Anniversary
 
Joined: Jun 2002
Posts: 331
Likes: 4
From: Southern Europe
Daniel

If it's of any usefulness check the link below in which it is mentioned
a swedish company that does airport performance analysis for several
aircraft types.

http://www.pprune.org/forums/showthread.php?t=59734

Probably you already know this but just in case you're not aware,
a B767-300 Take-off Weigth (Max) is around 185 tonnes. It could
be a case of, additionally to the extension, also needing to reinforce
the existing runway.

Hope that your airport project of extending the runway will go ahead.

Cheers,
Zerograv

Last edited by zerograv; 13th September 2007 at 22:05.
zerograv is offline  
Reply
Old 17th September 2007 | 08:06
  #7 (permalink)  
Prof. Airport Engineer
 
Joined: Oct 2000
Posts: 726
Likes: 0
From: Australia (mostly)
danieloakworth
Stage 1 in the process
At the very early planning stage, you would want at least a clear length of 3100m, being made up of 2500m runway plus 60m strip plus 240m RESAs at each end, plus for the sake of simplicity and erring slightly, a 2% clear takeoff gradient at each end of the 3100m. That will give you slightly constrained widebody operations. In a more perfect world, 3000m of runway is needed. Shoehorning a transatlantic operation into 1800m of runway with, at best, 90m RESAs is going to be a nightmare and shortsighted, but possibly do-able. So check your airport and see if it is really worth proceeding.
Stage 2
Check your existing runway strength. Almost certainly it has to be significantly strengthened (and maybe widened). It is ENORMOUSLY cheaper to close the runway for a few weeks or months and fix the insides of it then to overlay it. The cost of the strengthening and the extension will determine if it is really worth proceeding.
Stage 3 - professional analysis
Follow Mutt's advice, and get the professional performance analysis. This will validate and address the many assumptions and short-cuts in the process above, and it will give you your real options for extension length. The professionals will request the various surveys that the airlines themselves will later request. Then get an engineer to do a prelim design and a QS to cost the work, and the cost/benefit can be worked out to see if the airport can make money.
Stage 4
A visit to the Routes conference anybody?
OverRun is offline  
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread

Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.