Our company uses a fixed CI on all flights and I find that odd. When we first got the planes we would play with the numbers to see what if, but now all fixed. Does anyone know or use a flight plan system that veries the CI for saving money. Direct cost/fuel cost? In corporate aircraft we knew the numbers and fuel costs so we could operate the aircraft for the lowest cost per flight segment! Airlines hummm?

B737-800's
Fliifast1 is offline  
Old 1st Feb 2007, 16:00
  #2 (permalink)  
 
Join Date: Sep 1999
Location: ME
Posts: 5,502
Likes: 0
Received 0 Likes on 0 Posts
After doing a flight analysis program, we opted to use a single figure Cost Index for 3 reasons.

1: Crew convenience
2: Very little difference between cruise speeds and fuel savings within the small band of Cost Index values that would be used for our route structure.
3: B744 fleet actually LOST money by using Cost Index rather than a constant speed!

Mutt
mutt is offline  
Old 2nd Feb 2007, 03:22
  #3 (permalink)  
 
Join Date: Mar 2003
Location: ? ? ?
Posts: 2,281
Likes: 0
Received 0 Likes on 0 Posts
Does anyone know or use a flight plan system that veries the CI for saving money
Jeppesen, SITA those I am aware of.
we knew the numbers and fuel costs
The most important number in CI calculation is the hourly cost of the aircraft. Difficult to calculate from the top floor guys too.

Last but not least, mind to manage the speed as close as possible to the manufacturer project philosophy. I mean, sometime flying CI you cruise at lower speed than optimal, increasing your AOA and producing longher flight time and increased fuel consumption.

HVIII
Henry VIII is offline  
Old 2nd Feb 2007, 05:33
  #4 (permalink)  
 
Join Date: May 2000
Location: Seattle
Posts: 3,196
Likes: 0
Received 0 Likes on 0 Posts
The most important number in CI calculation is the hourly cost of the aircraft. Difficult to calculate from the top floor guys too.
The exception here is in ACMI contracts. There, the customer has an EXACT cost per hour for ALL operating costs except fuel, and he has a good idea of fuel costs. Using these numbers, a rather precise optimum CI could be calculated.
Intruder is offline  
Old 2nd Feb 2007, 11:43
  #5 (permalink)  
 
Join Date: Mar 2003
Location: Here
Posts: 1,015
Likes: 0
Received 0 Likes on 0 Posts
The average fixed CI on Boeing units seems to be in the 20-40 margin.

Some operators use different cost index's for different airfields.

146
BAe 146-100 is offline  
Old 2nd Feb 2007, 18:35
  #6 (permalink)  
 
Join Date: Mar 2003
Location: ? ? ?
Posts: 2,281
Likes: 0
Received 0 Likes on 0 Posts
Totally agree, Intruder.

See also here.

HVIII

Last edited by Henry VIII; 2nd Feb 2007 at 20:15.
Henry VIII is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.