Go Back  PPRuNe Forums > Flight Deck Forums > Tech Log
Reload this Page >

ACARS Loadsheet


Notices
Tech Log The very best in practical technical discussion on the web

ACARS Loadsheet

Old 19th October 2005 | 17:18
  #1 (permalink)  
Thread Starter
 
Joined: Feb 2000
Posts: 62
Likes: 0
ACARS Loadsheet

A question to those of you using ACARS loadsheet; when you get an ACARS loadsheet, do you leave a signed copy behind or is there is some other way of stating the Commander's acceptance of the loadsheet?

Thanks for any info.

MFALK
MFALK is offline  
Old 19th October 2005 | 17:45
  #2 (permalink)  
10 Countries Visited
25 Anniversary
Veteran: Air Force
 
Joined: Dec 2000
Posts: 1,196
Likes: 20
From: Horsham, England, UK. ---o--O--o---
Arrow

I know VS print out two copies of the ACARS Loadsheet on the Flight Deck and leave a signed copy with the dispatcher/turn round coordinator.

However, I know of at least two US carriers that don't and indeed quite often taxi away from the gate without even having received the final loadsheet figures.. getting them at some point on the way to the Runway.
Out Of Trim is offline  
Old 19th October 2005 | 17:53
  #3 (permalink)  
 
Joined: Jul 2003
Posts: 204
Likes: 0
From: Mahlangeni
The policy in some companies is that when the aircraft moves by its own power, the Captain automatically accepts the ACARS loadsheet, thereby "signing" it by accepting to fly with the load as indicated on the ACARS loadsheet.

However it is advisable to get a copy of the full format loadsheet as at some less sophisticated stations (destinations/not home base) it makes it easier to dechipher the details in case you have to do your own loadsheet for the return flight and/or to assist the handling agent.
square leg is offline  
Old 19th October 2005 | 19:54
  #4 (permalink)  
 
Joined: Jun 1999
Posts: 63
Likes: 1
From: global
In BA we get a paper provisional loadsheet from the Dispatcher then receive an ACARS final loadsheet which we acknowledge via ACARS.
Charlie Pop is offline  
Old 23rd October 2005 | 11:00
  #5 (permalink)  
 
Joined: Jun 2001
Posts: 215
Likes: 0
From: Above 30,000 ft
In my company, acceptance or rejection is done via ACARS downlink. If the uplinked loadsheet is accepted, in addition they still want you to printout, sign & chuck it in the flight documents envelope. If you reject it, your downlink should contain the reasons for the reject.
gengis is offline  
Old 23rd October 2005 | 11:40
  #6 (permalink)  
25 Anniversary
 
Joined: Dec 2000
Posts: 2,132
Likes: 3
From: on the golf course (Covid permitting)
In BA we are blessed now by there being no requirement to keep any documentation post flight, no filing of plogs or loadsheets etc as they are all stored electronically. This MAJOR step forward happened about 3 years ago, and helps the co-pilots enormously in keeping level shoulders
TopBunk is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Thread Tools
Search this Thread

Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.