Go Back  PPRuNe Forums > Flight Deck Forums > Tech Log
Reload this Page >

Met Observations at LHR

Wikiposts
Search
Tech Log The very best in practical technical discussion on the web

Met Observations at LHR

Thread Tools
 
Search this Thread
 
Old 24th Nov 2004, 22:21
  #21 (permalink)  
 
Join Date: Nov 2004
Location: Sarf East
Posts: 2
Likes: 0
Received 0 Likes on 0 Posts
met observations at LHR

Typical of the management that we have at Heathrow...too many managers trying to justify their jobs and not talking to anyone, taking things for granted whilst trying to destroy the ATSA jobs which has been the culture for years rather than use them, train them properly and get full benefit from them. Still what do you expect from managers that couldnt manage their way out of a paper bag?
hallingbury is offline  
Old 25th Nov 2004, 19:48
  #22 (permalink)  
Thread Starter
 
Join Date: Jul 2003
Location: Cheshire, California, Geneva, and Paris
Age: 67
Posts: 867
Received 0 Likes on 0 Posts
I was led to believe that although the management knew about the ATSAs concerns about workload it was ignored until the ATCOs raised concerns as well and only then was a meeting held to discuss it. Is this true?
DC10RealMan is offline  
Old 25th Nov 2004, 19:51
  #23 (permalink)  
 
Join Date: Oct 2000
Location: Berkshire, UK
Age: 79
Posts: 8,268
Likes: 0
Received 0 Likes on 0 Posts
God preserve us......
HEATHROW DIRECTOR is offline  
Old 25th Nov 2004, 23:34
  #24 (permalink)  
cranbournechase
Guest
 
Posts: n/a
DC10RM,

Almost correct. The ATSAs here have been discussing the consequences of SAMOS installation with the ATCOs, and the issue of workload priority was raised. It was identified that SAMOS would prevail over ATCO support, and therefore this was to the detriment of the VCR ATCOs, who were not happy with this arrangement. I understand that certain ATCOs have raised the issue at local Union/Tech Com level, but no ATCO (Prospect) reps were present at the SAMOS meeting held last week. The meeting was actually called in response to a strongly worded letter to the Project Manager from the PCS Branch Secretary. We are now waiting for Management to come back to us over the issues and possible solutions which were discussed.

Also - check your PMs
 
Old 28th Nov 2004, 19:30
  #25 (permalink)  
GT3
 
Join Date: Aug 2002
Location: UK
Posts: 531
Likes: 0
Received 0 Likes on 0 Posts
If you want prospect reps to come next time have a quick word with the chair or secretary and we will be happy to send someone.
GT3 is offline  
Old 1st Dec 2004, 19:39
  #26 (permalink)  
 
Join Date: Sep 2004
Location: South East
Posts: 154
Likes: 0
Received 0 Likes on 0 Posts
I have been an ATCA/ATSA for 14 years and a met observer for 11 years. I have both a full met ticket and SAMOS trained. In my opinion the SAMOS training falls short of what is required of a Met observer. When using SAMOS all of the visual elements have to be verified by the ATSA, Vis, cloud and Wx. The cloudbase recorder is at best poor. As it only looks straight up it doesn't give the full picture and cannot be taken as gospel. I am sure that any ATSA worth his salt would take on board any help or constructive criticism from pilots. It is very helpfull to have a cloudbase report from time to time. Please be gentle with us though, met observing is a steep learning curve and we are sensitive creatures.
lobby is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.