To be fair, it doesn't say plastic anywhere in the article. Could be something metal but just not as permanent as a rivet

DaveReidUK 10th Apr 2021 11:20

ATC Watcher

I think you are finding things that aren't in the article.

Firstly, there is no reference to "plastic" fasteners. In fact the term "fasteners" could mean pretty well anything used to attach something to something else.

Secondly, there is no suggestion that the change in process was in any way the decision of the individual carrying out the job. If it was, Boeing have even more problems than we thought.

ATC Watcher 10th Apr 2021 13:20

oops , re "my definition of "fasteners" it is a translation issue. In our avionic workshop we translate "Kablebinder "as "cable fastener "while in fact the correct translation should be "tie-wrap" . this is what I had in mind, hence my reference to plastic. I did not realize you could have metal fasteners. I learnt something.
On the without supervision , well that is what the article says :,

FAA spokesperson Ian Gregor said Boeing’s manufacturing switch from rivets to fasteners was “a minor design change” that did not require approval by either the federal safety agency or the internal Boeing organization that represents the FAA and assures compliance with regulations.
That is the supervision I meant.

ivor toolbox 10th Apr 2021 16:07

Usually means a swap to nuts, screws ( bolts) and washers as an alternate to rivets. You would not retain a power supply unit to a avionic rack with tie wraps, think someone is losing a lot in translation

DirtyProp 14th Apr 2021 11:49

Possible electrical problems on the 737 Max
 
Some of them, not all it seems.

https://www.krqe.com/news/latest-new...er-operations/

The Chicago-based airplane manufacturer told 16 customers to look at a possible electrical issue in a group of before “further operations.”

“The recommendation is being made to allow for verification that a sufficient ground path exists for a component of the electrical power system,” Boeing said in a statement Friday morning.

Edit: didn't see the previous thread, apologies.

esa-aardvark 15th Apr 2021 09:13

Remember, years ago, receiving some USA electronics boxes placarded
'caution heavy ground currents'. Our European supply wiring expected
ground current to be fault current, and trip the supply. Seems Neutral and
Earth were a bit mixed up. Lots of troubleshooting until the lease could be ended.

Lyneham Lad 27th Apr 2021 14:14

New 737 Max issue affects nearly two dozen airlines, 106 jets: FAA
 
More problems for Boeing (article on Flight Global)

New 737 Max issue affects nearly two dozen airlines, 106 jets: FAA

Article intro:-

The US Federal Aviation Administration has disclosed new details about an electric problem that forced the grounding of more than 100 recently-produced Boeing 737 Max.

Though the issue primarily affects jets delivered by Boeing after the FAA lifted the grounding in November 2020, several Max delivered before the grounding are also affected, according to the agency.

The issue involves “potential degradation of bonds associated with electrical grounding of equipment that could affect the operation of certain systems”, says the FAA in a 22 April “Continued Airworthiness Notification to the International Community”.

Potentially affected Max systems include standby power control units, “P6” circuit breaker panels and main instrument panels, it adds.

Click the link for remainder of article.

WillowRun 6-3 29th Apr 2021 21:27

FAA Reportedly Taking a Closer - and Broader - Look
 
News item in Wall Street Journal (website at present) reporting that FAA is conducted an audit of the source of the electrical system problems, specifically an audit wider in scope and more in-depth than presumably would be the agency's routine. Excerpts from article:

"As part of its audit, the Federal Aviation Administration is investigating why Boeing missed that a minor production change involving drilled holes wound up the root of potential electrical problems" [referencing unnamed sources].

"The audit is expected to delve into issues beyond those addressed by a typical agency review of such problems. Regulators plan to examine how other minor production changes were handled, these people said. The agency’s senior safety managers want to understand whether oversight changes might prevent future mistakes" [also ref. unnamed sources].

The article goes on to quote an FAA directive issued this week, which reportedly said: "the electrical issue could result in the 'loss of critical functions and/or multiple simultaneous flight deck effects, which may prevent continued safe flight and landing.'" (internal quote in article).

Evidently hoping to provide context, the FAA also said - according to the article - the following: “The multilayered safety oversight system caught this issue, and the FAA, operators and Boeing took action to mitigate the issue prior to an incident or accident.”


All times are GMT. The time now is 06:02.


Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.