Questions for RAN SQN Pilots 817 or otherwise
Thread Starter
Join Date: Feb 2006
Location: In my Hammock or at the Pub!
Posts: 140
Likes: 0
Received 0 Likes
on
0 Posts
Questions for RAN SQN Pilots 817 or otherwise
A couple of issues here ref SHARK 02.
Can anyone comment on the below?
1. Safety management culture
2. redundancy (in this case pitch axis)-Aircaft design
3. supervision and independendants
4. Maintenance culture
5. Availability of spares and life of type projects
6. Adherence to Maintenance manual procedures and OEM
7. Post corrective maintenance test flying and QA of critical flight components post test flight
8. SENJO input and maint release
Q1-Was the maintenance carried out on the said aircaft conducted IAW AAP and Maintenance manual procedures. Was it overseen by a supervisor and was it eventually signed up as serv by the independant? What input did the final QA/SENJO have?
Q2-What sort of post maintenance test flying was carried out for a critical flight control component? Was a maintenance pre flight carried out as opposed to a pilot pre flight? was the test flight carried out IAW with the applicable AAP by qualified Maint test pilots. Did inspections occur prior to buttoning up the Aircraft so visible inspections of corrective maintenance areas were valid.
I am not attempting to apportion blame or point fingers or throw stones in glass houses. I am interested to hear the SQN reps and execs side of the story. PM me if appropriate. Thread will appear on Mil Forum as well.
I am throwing out some issues that have been buzzing around my head since the accident of Shark 02. ADF Maint affects all ADF pilots.
Maxee.
Can anyone comment on the below?
1. Safety management culture
2. redundancy (in this case pitch axis)-Aircaft design
3. supervision and independendants
4. Maintenance culture
5. Availability of spares and life of type projects
6. Adherence to Maintenance manual procedures and OEM
7. Post corrective maintenance test flying and QA of critical flight components post test flight
8. SENJO input and maint release
Q1-Was the maintenance carried out on the said aircaft conducted IAW AAP and Maintenance manual procedures. Was it overseen by a supervisor and was it eventually signed up as serv by the independant? What input did the final QA/SENJO have?
Q2-What sort of post maintenance test flying was carried out for a critical flight control component? Was a maintenance pre flight carried out as opposed to a pilot pre flight? was the test flight carried out IAW with the applicable AAP by qualified Maint test pilots. Did inspections occur prior to buttoning up the Aircraft so visible inspections of corrective maintenance areas were valid.
I am not attempting to apportion blame or point fingers or throw stones in glass houses. I am interested to hear the SQN reps and execs side of the story. PM me if appropriate. Thread will appear on Mil Forum as well.
I am throwing out some issues that have been buzzing around my head since the accident of Shark 02. ADF Maint affects all ADF pilots.
Maxee.
Join Date: Oct 2004
Location: Australia
Posts: 75
Likes: 0
Received 0 Likes
on
0 Posts
The transcripts from the Board of Inquiry can be found by following this URL:
http://www.defence.gov.au/sea_king_boi/
The Board is still sitting but the transcripts are up to date. New transcripts are usually added withint 24 hours of the sitting day ending.
You will find, after a lot of reading (7803 pages so far), that most of those directly or indirectly involved have been called as witnesses. The witnesses have given frank and open answers to questions such as those posed above.
http://www.defence.gov.au/sea_king_boi/
The Board is still sitting but the transcripts are up to date. New transcripts are usually added withint 24 hours of the sitting day ending.
You will find, after a lot of reading (7803 pages so far), that most of those directly or indirectly involved have been called as witnesses. The witnesses have given frank and open answers to questions such as those posed above.