Go Back  PPRuNe Forums > Aircrew Forums > Rotorheads
Reload this Page >

CH 53 "Upgrade"

Wikiposts
Search
Rotorheads A haven for helicopter professionals to discuss the things that affect them

CH 53 "Upgrade"

Thread Tools
 
Search this Thread
 
Old 23rd Dec 2005, 15:59
  #1 (permalink)  
Thread Starter
 
Join Date: Jul 1999
Location: Warrington, UK
Posts: 3,840
Received 77 Likes on 32 Posts
CH 53 "Upgrade"

Mi 26 Halo the worlds biggest? Check out proposals for the US Marines "new" CH 53.
Defense Science Board Task Force on Mobility
Scroll down to page 55/56, "Future Capabilities"

Future Capabilities
Proposals have been made to extend the capabilities of the CH-
53E. The current design has a 79-foot diameter rotor and can
transport a 9,500-pound load 110 nautical miles. The services are
pursuing designs designated as the CH-53X and the CH-53X+. They
promise capabilities not achievable with the CH-53E:
�� The CH-53X would retain the 79-foot diameter of the CH-
53E but would operate with a disc loading of 16.3 lbft-2 in
contrast to the disc loading of 14.23 lbft-2 used in the CH-
53E. It would obviously require a higher-performance
engine than the one used in the CH-53E. The proposed CH-
53X design should allow the transport of a 27,000-pound
load over a distance of up to 110 nautical miles.
�� The CH-53X+ is designed to carry a 40,000-pound payload
to a range of 250 nautical miles. It would require making
major aerodynamic and structural changes to the CH-53E.
Maintaining current disc loading would require a 116- to
120-foot-diameter rotor. This modification would in turn
require a redesigned fuselage and an extended tail rotor
boom.
MightyGem is offline  
Old 26th Dec 2005, 20:44
  #2 (permalink)  
 
Join Date: Jul 2004
Location: Durham, NC USA
Posts: 373
Likes: 0
Received 4 Likes on 3 Posts
CH-53X

The present C/MH-53E has a significant amount of growth built in in reserve. The present aircraft spec called for a 32,000 pound external load (self retrieval mission) over a 50 NM range that it handily demonstrated with reserves in the 1980s. It also far exceeded the 9500 lb 110 Nm mission in 1994 when a production MH-53E transported a more than 8000 lbs of payload 750NM none stop without refueling, at an average speed of 130 kts. I believe that hot and high performance improvements as well as significant improvements in R & M are goals of the new design. Most of the performance improvement will come with a grown in installed engine power and structural beef ups. These improvements will make the beast a real beast
Jack Carson is offline  
Old 27th Dec 2005, 04:56
  #3 (permalink)  
 
Join Date: Apr 2003
Location: USA
Age: 75
Posts: 3,012
Likes: 0
Received 0 Likes on 0 Posts
Some non-authoritative word:

The 53X will have an S-92 type rotor head, with the same basic design (redundant wrap-around arms and flaw tolerance) as well as S-92 type blades (advanced airfoils and full composite design).

The engines will be significantly higher in power (6,000+ HP vice today's 4300 HP) to give the aircraft much more hot/high performance. The transmission will be somewhat upgraded from today's, but of the same basic design.
NickLappos is offline  
Old 27th Dec 2005, 05:02
  #4 (permalink)  
 
Join Date: May 2002
Location: Downeast
Age: 75
Posts: 18,300
Received 523 Likes on 218 Posts
But will not have the contracts being reserved for the V-22 Osprey....unfortunately!
SASless is offline  
Old 27th Dec 2005, 10:07
  #5 (permalink)  
 
Join Date: Oct 1999
Location: Den Haag
Age: 57
Posts: 6,297
Received 351 Likes on 197 Posts
Nick,
will be that a 4 bladed head, or is there a 5 bladed one waiting in the wings?
212man is online now  
Old 27th Dec 2005, 13:27
  #6 (permalink)  
 
Join Date: Oct 1999
Location: Beyond the black stump!
Posts: 1,419
Received 15 Likes on 8 Posts
My guess would be no less than 7!
Cyclic Hotline is offline  
Old 27th Dec 2005, 16:32
  #7 (permalink)  
 
Join Date: Mar 2003
Location: the hills of halton
Age: 71
Posts: 809
Likes: 0
Received 0 Likes on 0 Posts
I would imagine blade fold on 7 could be a challenge.
widgeon is offline  
Old 27th Dec 2005, 17:04
  #8 (permalink)  
 
Join Date: Oct 1999
Location: Beyond the black stump!
Posts: 1,419
Received 15 Likes on 8 Posts
fish

The 53E already has blade fold, so I can't imagine any real difficulty incorporating it on another rotor head.
Cyclic Hotline is offline  
Old 28th Dec 2005, 01:41
  #9 (permalink)  
 
Join Date: Mar 2003
Location: the hills of halton
Age: 71
Posts: 809
Likes: 0
Received 0 Likes on 0 Posts
Doh ......... I really should pay more attention .
widgeon is offline  
Old 29th Dec 2005, 10:21
  #10 (permalink)  
 
Join Date: Apr 2003
Location: USA
Age: 75
Posts: 3,012
Likes: 0
Received 0 Likes on 0 Posts
junglyAEO,

The CH-53X (I believe it will be called the 53F) was approved as a full SDD (System Design and Development) program this month, which pays for the design and development of the aircraft, including building and testing the prototypes. Full production is planned and budgeted, and when the prototypes pass the required tests, will be authorized.

It is a GO!
NickLappos is offline  
Old 3rd Jan 2006, 07:01
  #11 (permalink)  
 
Join Date: Apr 2003
Location: USA
Age: 75
Posts: 3,012
Likes: 0
Received 0 Likes on 0 Posts
Re: CH 53 "Upgrade"

jungly,
I believe the geometry grows a bit, so that disk size, airfoils and power all contribute to the performance gain. That being said, fitting it onto existing ships is the requirement, so the growth must be contained. Modest diameter increases with proper fold, should make it managable.

Here:
http://www.globalsecurity.org/milita...rcraft/hlr.htm
NickLappos is offline  
Old 3rd Jan 2006, 15:04
  #12 (permalink)  
 
Join Date: Nov 2005
Location: Coastal
Posts: 527
Likes: 0
Received 0 Likes on 0 Posts
Re: CH 53 "Upgrade"

The CH-53X is now known as Heavy Lift Replacement (HLR).
At this point it is planned as the full monty and the program is up and running.

- First flight scheduled for 2011
- Initial Operating Capability scheduled for 2015
- Full Operating Capability scheduled for 2021
- Development funding approved for fiscal year 2006
- Programmed USMC buy: 156 aircraft

Background on the CH-53D and E:
http://hqinet001.hqmc.usmc.mil/AVN/M..._Wing/ch53.htm

Interesting HLR related topics (have to love the skycrane variant!):
http://www.defenseindustrydaily.com/...oval/index.php

It won't happen tomorrow but it's going to happen.
Evileyes is offline  
Old 3rd Jan 2006, 20:23
  #13 (permalink)  
 
Join Date: Oct 2002
Location: 1 Dunghill Mansions, Putney
Posts: 1,797
Likes: 0
Received 1 Like on 1 Post
Re: CH 53 "Upgrade"

Nick got the jump on the media on the SDD decision, but it's confirmed in this week's Flight. Key take-away here is that the House's attempt to merge the program with the even larger (but much later) JHL program has been defeated, at least for now.

Although the CH-53X does get the 7-blade composite rotor, I was surprised to hear last year that the cathedral tips had been dropped. This was supposed to have been one of the technologies salvaged from Comanche.

And I really wouldn't hold your breath for an aircrane variant anytime soon...

I/C
Ian Corrigible is offline  
Old 3rd Jan 2006, 21:22
  #14 (permalink)  
 
Join Date: Jul 2004
Location: Canada
Posts: 46
Likes: 0
Received 0 Likes on 0 Posts
Question Re: CH 53 "Upgrade"

Why so long (5+ years) till first flight? And then only four years to IOC, so all the support work will be compressed into a mad scramble.

It doesn't appear to include anything Sikorsky doesn't already know how to do, and is supposedly an "upgrade", so one would think first flight should be possible in three years or so.

With such a long time to first flight, it will be vulnerable to budget axes for some time.
plt_aeroeng is offline  
Old 4th Jan 2006, 04:40
  #15 (permalink)  
 
Join Date: Apr 2003
Location: USA
Age: 75
Posts: 3,012
Likes: 0
Received 0 Likes on 0 Posts
Re: CH 53 "Upgrade"

plt,
The typical Navy program is paced to do things very slowly, and the Navy qualifications are lengthy and costly. The typical such program takes about twice as long as actually needed, On the positive side, when the test is finished, it has been a thorough test!

Last edited by NickLappos; 24th Jan 2006 at 21:40.
NickLappos is offline  
Old 6th Jan 2006, 14:30
  #16 (permalink)  
 
Join Date: Oct 2002
Location: 1 Dunghill Mansions, Putney
Posts: 1,797
Likes: 0
Received 1 Like on 1 Post
Re: CH 53 "Upgrade"

CH-53X gets a new moniker: CH-53K

Sikorsky, Marines outline new helicopter
Associated Press January 6th

Sikorsky will develop the U.S. Marine Corps' new heavy-lift helicopter over the next decade, bringing in nearly $19 billion for the company. Sikorsky is scheduled to deliver the first of 156 new CH-53K helicopters to the Marines beginning in 2015. It also will receive about $4.2 billion to revamp the Marines' CH-53E Super Stallion.

Col. Paul Coisetiere, Marine program manager, and Sikorsky program manager David Haines outlined the project at a news conference at the Pentagon Thursday.

The CH-53K will be a more durable, faster helicopter that can carry a significantly larger payload in adverse conditions, Haines said. The Marines are seeking a helicopter that can carry two armored Humvees or 27,000 lb of cargo 110 nm at an altitude of 3,000 ft in summer heat. That is more than five times the performance of the CH-53E. The helicopter also must fit inside military cargo aircraft and take up no more space on a ship than the current model.

The CH-53K will have improved rotors, engines, aviation electronics, transmission and gearbox. It also will be equipped with improved armor to protect crew and passengers. "If we had it today, it would be the perfect aircraft for combat operations in Afghanistan and relief operations in Pakistan," Coisetiere said.


I/C
Ian Corrigible is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.