Wikiposts
Search
Questions If you are a professional pilot or your work involves professional aviation please use this forum for questions. Enthusiasts, please use the 'Spectators Balcony' forum.

vectors

Thread Tools
 
Search this Thread
 
Old 28th Mar 2003, 07:10
  #1 (permalink)  
Thread Starter
 
Join Date: Mar 2002
Location: Buffalo, NY
Posts: 22
Likes: 0
Received 0 Likes on 0 Posts
vectors

In low ceiling (<300') conditions, how does guidance from ground control work? Do they give you turns for down wind, base, and final if you're still in overcast, and then it's up to the pilot to fly the beam until the runway is established visually?

I flew from Myrtle Beach to Atlanta last month, and we made a series of turns in solid overcast. I could not see the ground until just before I saw the runway threshold. This was at night, too. The guys in the pointy end have my admiration.
avialuver33 is offline  
Old 28th Mar 2003, 08:47
  #2 (permalink)  
 
Join Date: May 2000
Location: Seattle
Posts: 3,196
Likes: 0
Received 0 Likes on 0 Posts
Standard approach procedures are published, and the pilots carry the procedures for the airports they use, and follow them. Sometimes controllers will give vectors to intercept the Instrument Landing System final approach course, but the pilots can follow the printed procedures even if there is a radio failure.
Intruder is offline  
Old 28th Mar 2003, 13:48
  #3 (permalink)  
 
Join Date: Oct 2002
Location: Silicon Hills
Posts: 234
Likes: 0
Received 0 Likes on 0 Posts
At an airport like Atlanta, it can be very complicated in a technical sense. But in basic terms, we use radar to separate and sequence the arrivals to a point some 10-20 miles from the runway threshold. At this point we clear the crew to join and follow the Instrument Landing System, ILS or "Beam" as you called it. However, we still must manage the speeds of these aircraft until they reach the Final Approach Fix so the spacing remains adequate. At ATL and similar fields with simultaneous approaches to several parallel runways, there will be controllers assigned to monitor the aircraft closely all the way down final, and who can override communications at any time in case one aircraft strays ever so slightly from the approach course.

There are dozens of considerations to take into account during these operations, both on the ground and in the cockpit. Even though I've been vectoring for over two decades now, I'm still awed at the skill and technology involved in allowing commercial jet aircraft to land in fog so thick, I'm scared to drive over 40 mph in it.....

vector4fun is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.