Go Back  PPRuNe Forums > Ground & Other Ops Forums > Questions
Reload this Page >

Alternate Airport One-Up Minima (EU-OPS)

Wikiposts
Search
Questions If you are a professional pilot or your work involves professional aviation please use this forum for questions. Enthusiasts, please use the 'Spectators Balcony' forum.

Alternate Airport One-Up Minima (EU-OPS)

Thread Tools
 
Search this Thread
 
Old 16th Nov 2012, 18:48
  #1 (permalink)  
Thread Starter
 
Join Date: Apr 2002
Location: Europe
Posts: 79
Likes: 0
Received 0 Likes on 0 Posts
Alternate Airport One-Up Minima (EU-OPS)

Question (EU-OPS):
So I am looking at selecting an ALTERNATE AIRPORT. The alternate airport has an ILS with minimum required RVR 550m and a minima 200 AGL.

The required Wx for the alternate will be according to (One-up) i.e. next Non-precision approach, and the visibility for the Localizer approach is RVR 1200m and the minimum is 500 AGL (above ground level).

Does the ceiling have to be above 500 AGL for the localizer approach even if the Met Vis is forecasted 4000mon the TAF?

Thx
EightsOnPylons is offline  
Old 16th Nov 2012, 19:13
  #2 (permalink)  
 
Join Date: May 2009
Location: UK
Age: 37
Posts: 42
Likes: 0
Received 0 Likes on 0 Posts
Hi there,

Does the ceiling have to be above 500 AGL for the localizer approacheven if the Met Vis is forecasted 4000mon the TAF?

Doesn't have to be, but then you need to have two valid alternates that are acceptable in all respects (wind/vis/ceiling). Otherwise at the planning stage you would need to have a cloudbase of 500AAL if you only intended on holding fuel for one valid alternate.

Jim.
dawsonj1 is offline  
Old 16th Nov 2012, 19:16
  #3 (permalink)  
Thread Starter
 
Join Date: Apr 2002
Location: Europe
Posts: 79
Likes: 0
Received 0 Likes on 0 Posts
Thanks, for reply.

If the required ceiling is 500 AGL, can the Wx be OVC500, or does it have to be ABOVE 500 AGL?
EightsOnPylons is offline  
Old 16th Nov 2012, 19:34
  #4 (permalink)  
 
Join Date: May 2009
Location: UK
Age: 37
Posts: 42
Likes: 0
Received 0 Likes on 0 Posts
I think you may need slightly higher actually, i.e. cloudbase of BKN or OVC of 600ft due to the fact that we now need to fly non precision approaches using CDFA technique in which we add a suitable increment to MDA to make it a DA. However, I woud need to double check that and your company ops manual may give a specific answer for your particular operation.
dawsonj1 is offline  
Old 16th Nov 2012, 19:36
  #5 (permalink)  
Thread Starter
 
Join Date: Apr 2002
Location: Europe
Posts: 79
Likes: 0
Received 0 Likes on 0 Posts
It makes sense to me. Thanks for reply.
EightsOnPylons is offline  
Old 17th Nov 2012, 13:24
  #6 (permalink)  
 
Join Date: Aug 2000
Location: Scotland
Posts: 354
Likes: 0
Received 0 Likes on 0 Posts
I always thought that for planning purposes you had to take the cloud base into account so in this case it needs to be above 500' but once airborne you don't.
towser is offline  
Old 17th Nov 2012, 18:03
  #7 (permalink)  
 
Join Date: Jun 2002
Location: Wor Yerm
Age: 68
Posts: 4
Likes: 0
Received 0 Likes on 0 Posts
A reported cloudbase of 500' in the UK means that for 90% of the time, the actual cloudbase should be between 450' and 550'. An actual cloudbase of 450' will also have to be reported at 500' as cloudbases are only reported in 100 foot increments. So, it's quite reasonable to depart with a reported base of 500', if that's what you need. As for the reality of executing the approach, well that's not reported when make an approach. Therefore, if the viz is equal to or greater than your minimum, you have to perform a "look see" and go around if you are unable to obtain sufficient visual references to safely continue. Whether or not that is sensible is a different question.

PM
Piltdown Man is offline  
Old 22nd Nov 2012, 18:28
  #8 (permalink)  
 
Join Date: Apr 2012
Location: In Space
Posts: 683
Likes: 0
Received 0 Likes on 0 Posts
I was told that for a non precision approach the ceiling has to be considered, but for a precision approach only visibility is the determining factor.
B737900er is offline  
Old 24th Nov 2012, 10:21
  #9 (permalink)  
 
Join Date: Apr 2010
Location: Home soon
Posts: 0
Likes: 0
Received 0 Likes on 0 Posts
we now need to fly non precision approaches using CDFA technique in which we add a suitable increment to MDA to make it a DA
I thought it was the exact opposit,if you fly a CDA you do NOT need to add vis,if you use the old dive level method a higher minima must be used.

No?
de facto is offline  
Old 24th Nov 2012, 10:43
  #10 (permalink)  
 
Join Date: Mar 2001
Location: I wouldn't know.
Posts: 4,499
Likes: 0
Received 0 Likes on 0 Posts
If an EU OPS minima is on your plate for a non precision approach, it is already a DA so you do not add anything to it. If however it is mentioned as MDA only depending on your company rules you might have to add anything.
Denti is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.