Go Back  PPRuNe Forums > Non-Airline Forums > Private Flying
Reload this Page >

ECI Cylinder, proposed AD

Wikiposts
Search
Private Flying LAA/BMAA/BGA/BPA The sheer pleasure of flight.

ECI Cylinder, proposed AD

Thread Tools
 
Search this Thread
 
Old 20th Aug 2013, 08:22
  #1 (permalink)  
Thread Starter
 
Join Date: Jan 1999
Location: north of barlu
Posts: 6,207
Likes: 0
Received 0 Likes on 0 Posts
ECI Cylinder, proposed AD

The FAA is proposing an AD that would require the scrapping of IRO 60,000 cylinders about 34,000 of these would have to be withdrawn from service within 25 hours, the remainder can fly to a total time of 1000 hours before removal.

At the moment this action is only a proposal and the industry in the USA is objecting to it but I would expect the FAA to take further action following the AD it issued to combat the problem of some ECI cylinders having problems with the cylinder head separating from the barrel ( this AD requires 50 hour compression checks and cylinders to be scrapped at 2000 hours time in service ).
A and C is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.