TG at LHR T2

Thread Tools
 
Search this Thread
 
Old 27th Jun 2014, 22:11
  #1 (permalink)  
ZFT
N4790P
Thread Starter
 
Join Date: Jun 2002
Location: Asia
Age: 73
Posts: 2,271
Received 25 Likes on 7 Posts
TG at LHR T2

TG have announced a delay of their scheduled move from T3 to T2 next week due to "unplanned baggage system testing" with the move delayed until the end of the summer.

Is this TG only (for whatever reason) or are there real issues with T2?
ZFT is offline  
Old 28th Jun 2014, 18:16
  #2 (permalink)  
 
Join Date: Jan 2007
Location: EGLL
Posts: 559
Received 1 Like on 1 Post
EVA (BR) and Turkish (TK) also due to switch to T2 on same day, 02 July.

'Airline Moves' page of Heathrow website still shows BR moving 02 July, but
TG and TK mysteriously no longer feature on this page......
G-ARZG is offline  
Old 28th Jun 2014, 19:11
  #3 (permalink)  
 
Join Date: Jul 2011
Location: Edinburgh
Age: 39
Posts: 642
Likes: 0
Received 0 Likes on 0 Posts
T2 doesn't have it's own system for baggage, they feed in to the T1 baggage system, which had some problems last week.

I'm not saying they haven't done their homework, but perhaps LHR have underestimated the impact two terminals using one baggage network would have, so they have delayed the move to T2 until some improvements have been made.

I am not sure why they didn't build a baggage system for T2, it seems a bit rushed to me, surely a whole new terminal should be using all new technology and not piggybacking off the terminal it will eventually be replacing?

Last edited by edi_local; 28th Jun 2014 at 20:11.
edi_local is offline  
Old 28th Jun 2014, 20:19
  #4 (permalink)  
 
Join Date: Nov 2004
Location: UK
Age: 71
Posts: 137
Likes: 0
Received 0 Likes on 0 Posts
Glad I took a look at this thread, I'm flying BR to BKK on 20th July, I will need to keep an eye on whether or not they change. They probably will do since it is only one T7 a day. But I wonder what numpty thought not to build a baggage handling system for a new terminal which as I understand it is for the largest airline alliance to use, ie the Star Alliance. Similarly I was in T5 arrivals early this morning to pick up two young Aussie nephews of mine arrived from SYD. Only 4 lifts to the carpark!! Or was I not awake. No stairs either or perhaps I really am too dozy in the morning. Anyway four huge queues for the lifts. Beggars belief that some numpty allowed that.
gdiphil is offline  
Old 28th Jun 2014, 21:32
  #5 (permalink)  
 
Join Date: Jul 2011
Location: Edinburgh
Age: 39
Posts: 642
Likes: 0
Received 0 Likes on 0 Posts
T5 only has 4 lifts to/from the Heathrow Express/Underground platforms, so I am assuming they also serve the car parks. They run on a pattern meaning they go straight from the bottom to the top and then stop at intermediate levels on the way down, or something like that. They have no call buttons anyway. There are escalators from the trains, but it takes a while due to the sheer height of the building.

I am not sure if T2 will eventually have it's own baggage system (and a train to connect the satellite piers, at the moment it's a long walk) but there is space to put one in under the building itself. I know they will expand T2 sideways over what is now T1, so perhaps when that happens, a bigger baggage hall will be built and the current T1 system will be part of that?
edi_local is offline  
Old 28th Jun 2014, 22:47
  #6 (permalink)  
 
Join Date: Jan 2008
Location: Reading, UK
Posts: 15,819
Received 201 Likes on 93 Posts
I know they will expand T2 sideways over what is now T1
In due course the new T2 will expand northwards, in two phases.
DaveReidUK is offline  
Old 28th Jun 2014, 23:58
  #7 (permalink)  
Paxing All Over The World
 
Join Date: May 2001
Location: Hertfordshire, UK.
Age: 67
Posts: 10,149
Received 62 Likes on 50 Posts
As I understand it, the T2 bag system is due to open early 2015??? Reasons were about delivery times of equipment, access to site and blah boah but it's over a year since I read that. I sit to be corrected.

Or ask this specific question in the LHR thread of AA&R.
PAXboy is offline  
Old 29th Jun 2014, 09:11
  #8 (permalink)  
 
Join Date: Jan 2007
Location: EGLL
Posts: 559
Received 1 Like on 1 Post
gdiphil,
T5 car park is served by no less than 14 lifts,
in three 'banks of 4', and a bank of 2.
G-ARZG is offline  
Old 29th Jun 2014, 11:28
  #9 (permalink)  
 
Join Date: Jan 2008
Location: Surrey
Posts: 30
Likes: 0
Received 0 Likes on 0 Posts
The baa website still shows EVA as moving on 2nd July, but has no mention of TK or TG.

Knowing TG, my first suspicion was that it was likely to a TG lack of planning problem rather than a Terminal 2 issue.
11277m is offline  
Old 29th Jun 2014, 17:22
  #10 (permalink)  
Son of Slot
Super Senior Moderator
 
Join Date: Feb 2013
Location: London
Posts: 1,356
Received 104 Likes on 58 Posts
I think this thread has got too mixed up. We started with the important point of carriers moving between terminals at LHR.

Then a reasonable sidestep to baggage handling at T2 but then we leapt across to T5 and started counting lifts.

Very happy to have a thread about carrier moves between the airport terminals but other points probably best taken up in the Heathrow thread, as PAXboy mentioned.
S.o.S. is offline  
Old 2nd Jul 2014, 19:12
  #11 (permalink)  
 
Join Date: Jan 2007
Location: EGLL
Posts: 559
Received 1 Like on 1 Post
gdiphil - you have PM
G-ARZG is offline  
Old 24th Sep 2014, 00:34
  #12 (permalink)  
ZFT
N4790P
Thread Starter
 
Join Date: Jun 2002
Location: Asia
Age: 73
Posts: 2,271
Received 25 Likes on 7 Posts
Well, now have had the 'pleasure' of experiencing T2 with 3 return trips this past 2 weeks and I for one am not impressed. Incredibly long walks through some very bland corridors, broken down escalators every trip already, repetitive level changes and some awful check in arrangements.
TG are stuck in a corner and it seems to get quite congested (and with a new handling agent that isn't a patch on SAS in T3).

UAL check in was also a nightmare and spent an age queuing.

Once this terminal is fully occupied it is going to be a nightmare.

I never though I would say this but T3 was better!!!

Last edited by ZFT; 24th Sep 2014 at 11:21.
ZFT is offline  
Old 24th Sep 2014, 07:20
  #13 (permalink)  
 
Join Date: May 2009
Location: Confoederatio Helvetica
Age: 68
Posts: 2,847
Likes: 0
Received 0 Likes on 0 Posts
Mrs ExXB travelled LX to LHR a couple of weekends ago. Although still in Terminal 1 the aircraft uses T2 gates. She commented on the very long walk, poorly signposted, with not-working escalators and non existent travelators.

Will likely improve once LX finally moves to T2 but it is a real pain for their loyal customers.

By Motorway BRS is about 40 minutes further from her Dads's house than is LHR. With the walking etc at T1/2 she says it's quicker to use BRS than LHR, and often cheaper too.
ExXB is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.