Tristar ZD949
Gents
This former RAF jet, which has been parked up at Cambridge for some time was yesterday cut up and has been leaving by the truck load today. :{ |
Ah yes! Glass cockpit upgrade aircraft. How did that go again?
|
Well... Successful part of a TriStar fleet enhancement that never happened due to the decision to spend £Billions on the FSTA.
OAP |
ZD949. Thankyou for all your great service. Tanked from it and gave from it. A truly Great airframe, like all of its type. :D
OAP |
ZD949 fiasco....
October 2006 - Marshall Aerospace is awarded a £22M contract to upgrade the RAF TriStars' avionics and FMS including a 'glass cockpit' as the 'MMR upgrade'. This should have been a relatively low-risk programme as it used elements of the C-130 cockpit upgrade already underway for the RNAF. November 2007 - ZD949 arrives at Cambridge for the trial installation with a planned completion date of Q3 2008 at which time the second TriStar would begin conversion. 2008 came and went. 2009 came and went. January 2010 - ZD949 finally makes its first flight with the MMR upgrade. October 2010 - SDSR indicates that the TriStar will start to leave RAF service in 2013; TriStar MMR programme is to be discontinued. December 2010 - After 100 hours of flight test, ZD949 finally passes MoD review and is due to be back in service in Spring 2011. 2011 - Due to the change in out-of-service date now planned for the TriStar and with the A330MRTT due in service by the end of the year, ZD949 remains at Cambridge in a pristine state under 'storage' and is to be 'reduced to spares' - a euphemism for being scrapped - as it would be too expensive to convert it back to its original state. October 2011 - A330MRTT now 'Voyager' fails to meet release to service date; now expected to be 'sometime in January 2012'. January 2012 - Voyager still not in service. February 2012 - Voyager still not in service. March 2013 - Voyager still not providing an AAR service; 3 x VC10 have to stagger on until Sep 2013. September 2013 - VC10 retired, but Voyager still not providing a complete AAR service. March 2014 - TriStar retired, but Voyager still not providing a complete AAR service. May 2014 - ZD949 finally scrapped having never been returned to RAF service during a wasteful, expensive 7 year programme. ...and Voyager still doesn't have a working AAR Mission System.....:rolleyes: "Hecha en España = No funciona!" |
Beagle is correct. The saga reflects badly on the whole FSTA programme IMO.
OAP |
It went well and it was successful?
My word. Seems like if it wasn't for those pesky FSTA types, the RAF would be enjoying the services of an upgraded and reliable Tristar fleet, 9 aircraft on the line , good to go and dispatching with great reliability. Can't believe they didn't go for it...... Pretty aeroplane though. Beagle, I thought I'd read somewhere that the voyager was now cleared as a 3point tanker, doesn't that make it fully AAR capable now? |
Now don't be pessimistic, BEagle.
That timetable would be seen as a roaring success in some parts of the MoD. |
OAP, the saga reflects badly on MoD planning assumptions and A330MRTT development issues rather than PFI per se. Which I agree is bolleaux, but that's beside the point.
Arty Fufkin, hardly. There are still significant issues concerning the entire Mission Planning System, which simply Does Not Work. So, as I understand it, for in-flight AAR deployment trail re-planning they're having to faff about with the nonsense of 'RAPS', bits of string and whiz-wheels, rather than using the MPS which was supposed to have been supplied 3 years ago......:uhoh: |
Whiz-wheels!!!! They'll be bringing back navigators next! ;)
|
So it's doing UK AAR, deployed AAR, AT including ETOPS and into theatre. It's also doing trails to the same level of competence as the VC10 and Tristar but with significantly better offloads.
Tough crowd! |
Arty, part of the enhancement was a fleet increase to 15 airframes. I personally wonder if anyone has had control of the heavy side of RAF forward thinking since about 1990?:sad:
OAP |
Nice one BEagle, summed up to a tee!:ok:
Was at Brunty on Sunday and heard that the Tristars there had been sold in America with the first one due out in the next few weeks. Anyone else? |
Like I said, it was a lovely aircraft and it would have been great to have a large fleet of updated, serviceable airframes. The jet was largely misunderstood by most of the RAF I'm my opinion, probably because of sniping from the VC10 fraternity (particularly the nav mafia),but not helped by the fact the the Fleet has no young blood on it until the mid 90s.
A very capable aircraft....for it's day, but performance wise, well outclassed by the A330. I really don't see how it could have continued in service, the glass cockpit mod would never have improved fleet availability, and increasing the fleet to 15 would only ever have served to shorten the supply chain to the width of the apron! The curtain call was the point at which it was deemed too unreliable to conduct any AT tasking that was not Herrick. At that point, it didn't matter how cheap it was in comparison to its replacement, if you're paying not a lot for F£&k all, you're paying well over the odds. If reliability was a possibility ( and it would need to be a certainty) I'd agree that there should be 15 tri motors at BZZ rather than , what...8? voyagers. I just don't see that that was ever going to be possible. Stand 'em up! |
The trouble is Arty, while you argue about relatively minor improvements (that I would largely dispute), the cost of FSTA is sending the rest of the RAF to hell in a handcart. The truth is, that a well managed enhanced TriStar fleet could have done the job for a fraction of the cost of the FSTA. Maybe, with TriStar, we could have afforded an MPA capability as well!:oh:
OAP |
Gents
There is footage of the demise of this jet.:{ |
Better offloads than the TriStar....? Do you mean 'bigger' or 'faster'..... I think the TriStar with fully serviceable belly tanks could carry more fuel.....
|
sigh, yawn, here we go again! "For a fraction of the cost of FSTA..." How much then -do you even have the faintest idea, OAP? I'm as sad as you to see a fine old bird being cut up but you're confusing (again) the low capital cost of very old airframes with the (eye-watering) cost of running them
ps, No, dark side he said offload and I suspect that's what he meant. The tri might theoretically be able to CARRY more, if it wasn't ramp wt limited, which it would be many places but would burn the extra and more, unless the refuelling was to take place above it's base. |
Sigh yawn Shottie, you do not have to join in if it bores you! Of course, no one would dispute the cost curve of maintenance. However, TriStar was so cheap, you would not believe! As I have said, I give it 5 years before the FSTA goes off the rails! £££££££££££££££££££££££££££££
OAP |
December 2010 - After 100 hours of flight test, ZD949 finally passes MoD review |
Water Bomber in America.
Yes the Timmys at Brunty will not carry ZD or other military registrations, they are all on the FAA register and will be flying to Texas to begin dropping water on fires.. Biggest loser? the tax payer.. Frames sold by the DSA for thousands have been sold for millions by the next vendor... DSA bring a cost effective return to the tax payer.. Rubbish.
|
Biggest financial loser is indeed the taxpayer, by £Billions!:eek: Biggest capability loser of the whole deal is...the RAF.:ugh:. How can this unnecessary and hugely expensive replacement of a capability we already had go unremarked by journalists or anybody else?
OAP |
|
The National Audit Office was very critical of the PFI method for contracting Voyager, noting that 80% of the annual average $585 million fee that AirTanker will receive over the coming years for the contracted baseline service is for financing, capital cost and profit.
No doubt the MoD was surprised that ATr actually intends to make a profit...:rolleyes: |
Being serious (I know, on this forum?) with the availability of many Tristars stored in hot places on the other side of the Atlantic, the acquisition of another 6-10 airframes for IFR conversion and a huge holding of spares would surely have allowed the refurbishment and modernisation of the existing fleet for another 10-15 years at much less cost than the Voyager programme. The VC10s could have been phased out as they came to the end of their lives and the RAF would still have a 15+ strong fleet of relatively young tankers fitted with glass cockpits, modern avionics and a full DASS suite.
And yes, I agree that the Voyager is (or will be) a very capable airframe, but the Tristar was as well when it was available. And with the outright purchase of new tankers never going to happen, surely it should have been seriously considered? |
Martin,
Mid to late 2000's (2006-2007 maybe, my memory fails me) this was looked at, we got as far of receiving the quote from Marshalls (£1M per airframe + conversion costs), we even dispacted a team to inspect the 3 proposed frames in the desert. However, if memory serves me right, there was a clause in the AirTanker contract that put a stop to this. |
Assuming the contact had by that point been signed, I doubt if it was a particular clause that was the problem.
More to do with having signed the contract? Even the MOD wouldn't be daft enough to sign a contract for replacement tankers then go out and buy replacement tankers. Then again........ |
Even the MOD wouldn't be daft enough to sign a contract for replacement tankers then go out and by replacement tankers |
Is there a clause in the contract about ownership of the company - ie is it feasible that someone averse to UK interests could end up having control of our sole tanker assets
|
Interesting that that should be an issue when nobody gives two hoots about us relying for transport and trooping flights on overseas owned companies.
|
But if push comes to shove, in an emergency we could revert to UK carriers. Might be more difficult if tankers were foreign owned/controlled, unless they were requisitioned, but crews?
|
So it's ok to send our troops on aircraft based in another continent, flown by crews from, well, who knows, but assume that in an emergency we "could revert to uk carriers"..Would you apply such a reckless assumption to any other procurement decision?
|
IF, (big if), several of the TriStar's at Brunty go to the US, it is also possible they might end up on contract to the US Navy for AAR support.
OAP |
Shot1 - I never said I agreed with it - personally I am against PFI in principle, because the Government is generally so rubbish at setting contractual terms they get taken to the cleaners, and usually cannot get from the contract what they thought they could - generally applies to contractorisation as well - eg catering at RAF stations. Rant button "OFF"!
|
Being against PFI is an entirely valid point of view, wanderoo. Why does it have to be backed up with a pragmatic reason (which I strongly agree with) that the Govt is "rubbish at setting contractual terms?" Would your principles change if it WASN'T rubbish at this? What if we collectively left the rant switch firmly ON and demanded HMG hire clued-up professionals from the private sector to do the negotiating.... rather than let the deals be signed by any old duffer who happens to have been there a while -then hand him a knighthood when it falls flat?
|
demanded HMG hire clued-up professionals from the private sector to do the negotiating |
Not sure why the maths confuses people
example hot and dusty location, trimotor lifted on average 130k of fuel lets say 10 hr sortie, burn using worse case 8 k ph div fuel 15 k so thats 95 k available give is oohh 35k voyager 94k capacity thrrefore max lift same sortie 6k ph average worse case burn div lets drop it a bit say 12 k thats total 72k so avai give is oohhh lets see 22k pretty clear to me hey ho it is what it is, thats the decision we have to live with |
Valve closed
Not sure of your maths (or the punctuation) but I'm pretty certain the Voyager has a starting lift of 110k which sort of evens things up a bit. Oh and 2 wing pods!! |
The official position was stated that the TriStar K/KC and FSTA have a "similar" AAR capability. Both have advantages in different scenario's. However, the TriStar had the advantage of the centreline hose that suits large or small recievers.
OAP |
Excellent spin, OAP, to attempt to find an equivalence for an ageing single hose tanker.....:rolleyes:
Had the TriStar ever been modified to include wing pods, there might have been a reason to keep the old things going for a few years longer. But it was clear that, as soon as Voyager showed that it had at least some AAR capability, MoD was keen to get rid of the TriShaw as soon as it could. |
All times are GMT. The time now is 13:20. |
Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.