Nimrod R1's to be replaced by the even older Rivet Joint?
yup looks like it, taking bets that some baffoon in the MOD does not realise there are several versions of the CFM56 and that they get a none compatible variant.,
UK to finally get Rivet Joint? The UK MoD is set to announce a long-expected deal to buy three Boeing RC-135 ‘Rivet Joint’ aircraft. Gary Parsons - 14-Jan-2010 http://www.key.aero/central/images/news/inline/1404.jpg UK RC-135s will look similar to this USAF RC-135U fitted with CFM-56 engines as seen at RAF Mildenhall earlier this year. Key - Gary Parsons January 14: Flightglobal reports that the UK Ministry of Defence (MoD) is set to announce a long-expected deal to buy three Boeing RC-135 ‘Rivet Joint’ aircraft as replacement for its fleet of Nimrod R1s operated by 51 Squadron at RAF Waddington in Lincolnshire. One Nimrod R1 was withdrawn last year, leaving just two in service with the squadron. With the recent announcement by the Secretary of State for Defence of the early withdrawal of the Nimrod MR2 fleet by April, maintaining the pair of R1s will become more difficult and costly as Nimrod maintenance contracts are withdrawn. The report says that the three RC-135s will be modified for UK use by L-3 Communications Integrated Systems in the USA and are expected to be fitted with CFM-56 engines to provide commonality with the RAF’s fleet of E-3D Sentrys. Ironically the RC-135 airframes are expected to be even older than the Nimrods they will replace, the latter being constructed in the early 1970s. UK to finally get Rivet Joint?: Key.Aero, Military Aviation suppose if this falls through, we could re-engine the Shackletons that are lying about :E |
hahahahaha
Another case of "It must be invented/built in UK". Remember when we rejected the C-130? Remember NimWACS, because we had spare airframes after we were kicked out of Malta? I know, and understand, the the UK Govt has to try to support UK Industry, but we've been bogging this sort of thing for DECADES. We always end up producing kit that costs a fortune, is late and over-budget, has ZERO overseas sales potential [OK, exempt Tornado to date] and doesn't quite do the job. How many £BILLIONS have been wasted over the last 25 years ensuring a "Made in UK" stamp on the kit? And then buying foreign anyway? |
TheTiresome1,
What on earth are you prattling on about? Do you know ANYTHING about that of which you speak? The C-135 is manufactured by Boeing, a US company. The special fit is designed, manufactured and installed by L-3, a US company. The CFM-56 engines are a JV between the French and the US.............. Little bit more research and/or knowledge required before opening mouth? |
I am duly chastened - I actually thought there was a chance we were "Buying British", but I missed the bit about GE powerplants :ok:
No chance of a quick-fix Airbus 330 "Rivet France"? Oh well, c'est la vie. |
Let's hope they don't try & fit ex. Nimrod re-fuelling probes to save a few quid !
:eek::eek: |
Grandfer, there will be no problem ... once the UK has converted the AAR fleet from Probe and Drogue to The Boom. :\
It's called compatilibert ... comprabilyiby ... ask the Americans to help. ;) |
Hooray! More kit and a good capability. I can't wait :D
That is what we should be saying! But like "Grumpy Old Men" we start to enter the malaise and moaning that is PPrune's want... http://thenigelhaversimperium.4ya.nl...ow/1002587.jpg |
Silly me , then perhaps we can buy some KC-135s -50s vintage , about 20 should do for our 3 Jointed Rivets .
:ok::ok: |
Hooray! More kit and a good capability. I can't wait :D Somewhere down the line the US Military must have deemed them to be getting long in the tooth to be releasing them from service.. I often wonder especially with the predicament in the transport fleet with the aging VC10s etc why the MOD simply do not just purchase or lease as is the norm a load of the 737-900 series aircraft from Airlines that have gone to the wall and are currently stored at Lasham........ A cheap (in this time of excessive Civilian fleets) alternative of low houred transports, the saving in the fuel budget alone would be staggering over the VC10 and they could then be moved on at a later date back into the Civilian market. One wonders when uniforms will be sourced from the Army Navy surplus stores |
I think the issue is not the age of the airframes, but the kit that goes inside and the opportunity to share support with the US instead of operating just 2 ac with unique UK systems. I have heard on another forum that Rivet Joint is not quite as capable as the R1, but at least we'll have 3 systems in service.
|
I would suggest rather simply that;
(a) UK is broke, (b) you need the capability, (c) UK is broke, and (d) its offered by 'them'. No disrespect intended. |
So progress is replacing a capable but old system with a less capable (certainly by the accounts I've seen on here and elsewhere) and even older system? Whats wrong with a unique UK system in comparison to a unique US system that we don't have control over? Are we getting the full capability, particularly given the fuss over F35 code?
When exactly are we looking at introducing these into service, and will there be any sort of capability "holiday"? Beyond engines, how much commonality is there really between this and the E3? Are we just buying ourselves a bigger problems in buying 3 aircraft that we can support less well than the 3 we are replacing? |
We are skint but this project doesn't fill me with confidence, this sticking plaster approach only creates a bigger problem and costs later on. I'd rather see it gapped and the correct solution found and funded if that’s what it takes.
Wonder how the idea came about? BRIT - Hi Chuck, we have a problem with the old R1s, need to replace them a tad early. USAF - Hey Limey, no problem you can have some of our RJs real cheap for refit! RAF - Oh spiffing, thanks old man I'll call the contractors and ask if they can do it. USAF - Have a nice day now! More dialling: RAF - Hello is that the honest, fine, upstanding contractor? CONTRACTOR - Yes RAF - Can you convert 3 old 135s to the latest RJ spec, new engines, etc? CONTRACTOR - Yes (giggling in back ground) RAF - Can we do it quickly on the cheap we are skint? CONTRACTOR - Yes (laughing in background) RAF - Are you sure you know what happened last time, and the time before that, and the time before that, etc? CONTRACTOR - Mmmmmmm.......... YES! (hysterics, party music, corks popping and the sound of cash tills in the background) RAF – Excellent I'll just get the cheque book, toodle pip. CONTRACTOR – Yes.........yes........yes……………..oh he’s gone, right bonuses all round, who wants a new car, house, holiday, etc! Yes it's Friday and my glass is half empty :( |
@ pr00ne and others - I apologise for the substantial lack of clarity in my post No 2 which led to misinterpretation. My point, so badly expressed, was that at least on this occasion we weren't going to try and build a UK replacement for the R1s, and were going to buy from the US instead.
Subsequent reading here and in other places now suggests this may not be such a good deal after all, but as flyingblind said, what are the options? Soldier on with 2 R1s? Accept RJ as a "better than nothing" solution? Spend £Bns on a completely new system? Or perhaps accept that these days poor old UK Mil plc simply can't afford to sustain all these capabilities any more, and forget the entire thing? |
Are these a/c any younger than the Nimrods they are intended to replace?
|
In a word....No
The youngest KC/RC-135s are fiscal year 1963/64 so were built around that timespan. Although they were purchased with funds from that FY that does not mean they were built that year, but they wouldn't be that far behind it. V1 |
Why not just rebuild the R.1s then?
Does anybody know how old the 3 Nimrods are? (2 orig R.1 + the converted MR one) Or, Which three actual airframes are intended to be converted? There's plenty right old ones, wfu, in the Boneyard! |
Why was an MRA4 derivitive never considered?
|
Metman wrote
Why was an MRA4 derivitive never considered? http://www.pprune.org/military-aircr...placement.html http://www.pprune.org/military-aircr...-aircraft.html http://www.pprune.org/military-aircr...-aircraft.html http://www.pprune.org/military-aircr...1-upgrade.html TJ |
So, rather than use the 3 largely new (wings, engines, etc) Nimrod MRA4 prototype airframes PA1, PA2 and PA3, which become redundant shortly, and which would have not a little compatability with the 8 in-service MRA4 airframes, we are to take older than Nimrod R1, KC135, not RC135, airframes from the desert, send them somewhere for conversion taking several years, then deliver them to to UK for 2 or 3 more years messing around, before release them to service, maybe, as oddball aircraft ? And meantime the conversion jobs are exported to the USA. That all seem very clever. Might be understandable if we were taking off the shelf RC135s, but beyond my comprehension taking KC135s and converting them. :ugh:
|
This is not the first time that KC-135s have been converted to RC-135 standard. There seems to be a presumption that converting an airframe to SIGINT platform standard is a simple process - it ain't! At least the Yanks have done this before, and recently; conversion of MRA4 airframes would be a complete and utter unknown and who the hell will provide the mission system, or are you suggesting that we spend vast amounts of money moving the existing kit into an MRA4 airframe.
The KC-135 airframes will effectively be zero lifed, in a similar manner to the MRA4 airframes, so the relative age argument is largely specious. This may not be the perfect solution, but should provide a capability in reasonably quick time with very low risk! By the time the RJ airframes are due retirement, I suspect that UAS technology will have developed enough to provide a platform for a SIGINT payload. |
Looks like the 'goose-jacker' is on the case!
|
PIK3141 wrote
but beyond my comprehension taking KC135s and converting them. The US has been converting their tanker 135s into intel collection airframes since the early 1960s. The USAF during the late 1990s increased their Rivet Joint fleet by several airframes (C-135B conversions). In 2006 the latest Rivet Joint conversion from a 135 airframe was delivered to the USAF. TJ |
Good job 'they' decided to specify a boom on FSTA in order to provide AAR for these and any future platforms using boom refuelling......:ugh:
|
Unless the yanks are already at work on these, looks like another capability gap coming up!!
|
Are you getting baseline 11's or a previous model? Will 51SQN now be combined with the other RJ flying units doing the same job?
|
CAS, Air Chief Marshall Sir Stephen Dalton quoted on Monday that the Nimrod R1 will be in service until 2015 not 2011, so there may not be a capability gap?
|
No truth in the rumour that some of them coming off the line at Woodford will simply be scrapped??
|
RJ Contract
A little birdy tells me we have now signed up for RJ in PR10.
So are we going to buy booms to fit to our FSTAs, or are we going to try and ignore the fact we will have 3 RAF aircraft types that take recepticle refueling (C17, E3 and RJ)? F |
UK RJ
At last a decision!
UK approves Rivet Joint purchase |
|
UK RJ
Well, I was hoping never to see this in the UK.......
http://i478.photobucket.com/albums/r...aft/RC-135.jpg |
Perhaps the goosejacker should make the cheque 'post dated' ;)
Also wonder how U.K. Opposition Cries Foul On Pre-election Awards - Defense News would affect it, given that 'exportability' might be an issue and it's specifically mentioned as one of the projects. |
Pugwash, why not?
A good decision for once (though consistently delayed from what I hear). Looking forward to them arriving asap... And as for the boom on FSTA, no chance. It was dropped years ago and it's a PFI don't you know - in other words, we're shafted if we want to change the contract. Pity - some KC-45Bs with RR Trent would fit the job very nicely - and rather better than the plain-vanilla-at-Savoy Grill-prices deal we've got coming to us. (edited to add: but nice picture - good effort!) S41 |
Squirrel,
The arguments for and against have been aired in this and similar threads for some time. I know that the US Increments have been converging with the Helix capability, but it seems a step backward, given the terms under which the RJs are being acquired and will be operated. Clearly, the "operational sovereignty" issue has been overcome, or more likely, ignored. Oh, and I can't take any credit for the image either, nice though it is. |
I feel people should disassociate the airframe from the systems. The former is largely unimportant as long as it lasts longer and costs less to buy and operate than any given alternative. One can only assume that the '135 was cheaper and hardy enough to last until pilots and crew are no longer required.
|
Defense News is reporting that the first RAF RC-135 will be delivered in 2014. The capability gap from Spring 2011 will be filled by RC-135s partly crewed by the RAF.
USAF Planes To Help U.K. Fill SIGINT Gap - Defense News 'The first plane is to be delivered in 2014, three years after the RAF plans to withdraw the last two of its Nimrod R1 signals aircraft. A third R1 retired last year. The gap in Britain's electronic intelligence capabilities is likely to be filled by U.S. Rivet Joints tasked and partly crewed by the RAF, sources said. That could be a controversial move; for at least three years, the British will forgo control of what the defense secretary said in a statement March 22 to Parliament was a "vital capability." An MoD spokesman said that between "2011 and 2014, the U.K. will enter into a partnering arrangement with the U.S. that will safeguard U.K. personnel core competencies." The spokesman declined to provide more details. The U.K. will have "full sovereignty of the aircraft when received in 2014," the spokesman said. The spokesman said there were no details available on program costs; initial contracts will be placed in June.' TJ |
Excuse me if I've got this wrong but the bit where it says
- The spokesman said there were no details available on program costs; initial contracts will be placed in June - So does that mean we have decided to buy something but we don't know how much it will cost? How do we know there is not a cheaper alternative? As contracts have not been signed then presumably delivery times and schedules are just a best guess at what the customer would like so he can be got on a hook before putting in the small print and get outs in the actual contract. I am so glad we have MoD experts looking after our country's money and interests |
"- The spokesman said there were no details available on program costs; initial contracts will be placed in June -"
No it means that the costs are commerically sensitive and are not being publicly released at present. |
Cost as notified by the DSCA to Congress in 2008 was $1.068 billion. Even makes Nimrod start to look value for money...
|
All times are GMT. The time now is 01:56. |
Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.