PPRuNe Forums

PPRuNe Forums (https://www.pprune.org/)
-   Military Aviation (https://www.pprune.org/military-aviation-57/)
-   -   New DII(F) IT System (https://www.pprune.org/military-aviation/335460-new-dii-f-system.html)

Pontius Navigator 8th Nov 2008 12:08

CS, PM please

GOLF_BRAVO_ZULU 8th Nov 2008 15:11


Originally Posted by Pontius Navigator

if in your office you have a computer, with a monitor, scanner and speakers

Speakers? Speakers? Aunty Betty provides speakers? I demand a re-count; this is blatant discrimination against the Navy. This Silent Sevice thing can be taken too far, you know.

Incidentally, I can now get on here via the Firm's set up.

spheroid 8th Nov 2008 15:45

Speakers and a scanner..... Behave. The MOD doesn't issue speakers and scanners to the Armed Forces.... (do they?)......

....... You'll be telling me that DII comes with a colour printer as well.... ?

Pontius Navigator 8th Nov 2008 16:36

Well actually yes to both.

We were 'given' (no signing) 3 x Dell, plus speakers, plus scanners, plus printers plus bells and whistles for Dii/c but eventually Dii/c rolled up with 3 more but no scanners or sound cards.

When Dii/f rolled up, no scanner but you you should see the colour printer. Size of a beer cooler. Best bit is the consumables cost. Makes the monthly accounts bill look lik epocket money. On the net you can buy cartridges at about £150 or so each but through the catalogue you would see no change of £1000 for a set of 4.

I haven't done that much printing yet but I will be putting in a little test purchase to make sure I don't run out of toner :}

spheroid 8th Nov 2008 18:31

Well at least DII is good for a couple of things if it comes with Colour printers and scanners and speakers (not sure why we need speakers but hey)

Pontius Navigator 8th Nov 2008 18:43

Sorry, you miss read that. Scanners and speakers are not part of the Dii/F package but you might be able to get them from the catalogue.

Given the increasing use of CBT and other material that needs sound and colour printing then you could argue that you need it. You have Powerpoint but no means of getting imagery into it.

Is it right that you have to use your home computer and then email it to work?

As for colour printing, it is not one each. Plebs get the b&w laser and have to use the colour on a network basis. If you are lucky it is in the same building. For RAF CCIS we got one for the whole station. Naturally I had it installed near my desk. Very handy for colour posters :)

bit-twiddler 17th Nov 2008 21:31

One of the other things to mention about the colour printers is that they are set to 2 pages per sheet, double sided as default - apparently as a cost saving measure.

To change it you need to alter the settings under the "printers and fax machines" option otherwise it resets between prints. ;)

Pontius Navigator 18th Nov 2008 06:37

bit-twidler,

There was no paper economy with mine. It would burst in to life and throw out an inch of so of paper at a time, except it would only print a proper sheet per minute.

Every time they tried to configure it as a proper network printer it would issue more scrap paper. Finally they admitted the printer was not capable of being installed on the network and they had to get the manufacturer to write new drivers.

Don't know if it is fixed yet.

c-bert 18th Nov 2008 09:14


One of the other things to mention about the colour printers is that they are set to 2 pages per sheet, double sided as default - apparently as a cost saving measure.

Haha, terribly sad to admit but I actually know the chap that implemented that, and yes, he is a chisler.

Pontius Navigator 18th Nov 2008 18:55


Originally Posted by c-bert (Post 4538275)
Haha, terribly sad to admit but I actually know the chap that implemented that, and yes, he is a chisler.

Of course, under the DDA95, if I get anything printed in A5 rather than A4 that is too small to read then it is with file 13 or return to sender. No way am I straining my eyes. I demand big print.

The Annual report booklet came with a one or two page layout in minute grey scale script. They were unable to provide a readable copy so I filed it :}

cornish-stormrider 19th Nov 2008 09:28

Oh how I can see this one going on.........
My crystal ball ( ok it's a whisky glass) is a) empty and b) tells me that you are all royally screwed.

DO you remember how the RAF used to operate before this insidious coup by bad computing??

Guess what is coming over the hill.....

hey - blame it all on the computer system, they will never be able to prove you didn't do it (if you should have done it) and vise versa.

Wader2 19th Nov 2008 14:44


Originally Posted by cornish-stormrider (Post 4540453)
Oh how I can see this one going on.........

hey - blame it all on the computer system, they will never be able to prove you didn't do it (if you should have done it) and vise versa.

What email? I didn't get your email.

CounterSunk 27th Nov 2008 17:35

The madness continues. The new date for completion is now March next year, with more slippage expected. Gangs of contractors roam the camp turning off power and 'messing' with the network without any apparent direction or planning. Empty buildings get IT fitted, sections expecting at least a 'like for like' swap out are told not to hold their breath. Personnel posted in since the 'site freeze' are told they won't get accounts until the budget people order them in.

BOCS won't go DII, so we will have to cram the new machines in alongside the old. And to cap it all the CIS support section seems to have vanished.

And this is progress?

ASCOT Ops Retd 27th Nov 2008 17:49

I've progressed. I've left.

Dare I say I saw this coming?

spheroid 27th Nov 2008 21:00

What is BOCS ?

ASCOT Ops Retd 27th Nov 2008 21:24

Boeing Operational Control Suite. It's the air transport fleet tasking system. Introduced politically early, but not as disastrously as JPA, promised lots but it's been more of a live test than a saleable product. It creaked under Brize's existing network, but I guess that won't be a problem now...

proplover 27th Nov 2008 22:15

Funny you should of mentioned printers Pontius, one of the more recent "whoops we didnt see that comming" moments. Many army and RAF establishments have discovered just how much their stationary budgets are being clobberd by the "agreed pricing" of tonner replacemnts for the F printers. One Sqd Ldr I met was looking at a potential 3 to 4 fold increase in his costs and Ive heard similar stories eleswhere, may not sound much on one base but believe me when you multiply the number of printers and toner cartriges accross all MOD sites in UK, Germany and else where.......well with that money MOD could pay more compensation to wounded servicmen, or bought more\better equipment etc etc. Remember its an on going cost every year!

God if I hear another Atlas bloke say "lessons have been learnt" ..... The lessons were learnt in DiiA (Pilot scheme) and C its just that EDS and Atlas thought they knew better and have taken best part of two and half years to re-invent the Dii wheel to get us roughly back where we were at the end of C.

Pontius Navigator 28th Nov 2008 06:37

Proplove, yes, I told you so. I have been watching the printer consumables issue for many years. Our ALFENS ink-jet used to eat £1000 of cartridges per year - yup, in B&W.

Before Dii/f we had 8 or 9 inkjets on the unit and only 2 pairs the same. stock holding was IRO £500. We now added a B&W laser and a colour laser and Atlas removed our one economical B&W laser, Stock holding is now £1700.

cornish-stormrider 28th Nov 2008 12:44

go to PC world and by a cheap one, lie on JPA about the expenses and get a good deal on toner etc from cartridge world. Submit a GEMS and get promoted.
If you just get a generic usb printer and find a helpful fairy, leckie or computer nerd on sqn (there is always one) and get them to patch it in if the atlas have hidden the usb ports.......

Then send me 15 thousand pounds as a consultancy fee....

jobsa good un

proplover 28th Nov 2008 16:47

Ahhhhh if only! Think you'll find the adding of "non approved" printers may be more difficult than before.

You wouldnt belive how many inner pit lids and padlocks have had to be replaced due to a) existiting metal rings being cut through due to key missing for the padlock, b) lock being hot cut through so we could get into the pit and c) missing inner lids. These are not cheap relacements either especially as the new Approved Class 2 lock list came out! Hey guess what, someone has approved lock types with the hasp now being 14-15mm thick - many of the older pits only have 8-10mm holes!!! Also the body of the lock is of such a size now that often you cant physically position them between the two lids on older pits!! The cost of these locks is something else as well, by the time MOD get the bill I wouldnt be surprised at the figure being £160 a go.

Has anyone had an instance or heard of one where a person of dubious intent (outside of IT people :E) has tried to get into a pit to do no good?


All times are GMT. The time now is 17:38.


Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.