Go Back  PPRuNe Forums > Aircrew Forums > Military Aviation
Reload this Page >

Air Tanker to Spain

Wikiposts
Search
Military Aviation A forum for the professionals who fly military hardware. Also for the backroom boys and girls who support the flying and maintain the equipment, and without whom nothing would ever leave the ground. All armies, navies and air forces of the world equally welcome here.

Air Tanker to Spain

Thread Tools
 
Search this Thread
 
Old 22nd Jun 2012, 14:02
  #1 (permalink)  
Thread Starter
 
Join Date: Jun 2003
Location: Darn Sarth, UK
Posts: 15
Likes: 0
Received 0 Likes on 0 Posts
Air Tanker to Spain

Thoughts go out to the chaps at Cobham:

Cobham air tanker work moves to Spain, 320 jobs to go - Telegraph

Will await the verdict in Private Eye!

rustybh is offline  
Old 22nd Jun 2012, 17:49
  #2 (permalink)  
 
Join Date: Feb 2006
Location: Hanging off the end of a thread
Posts: 33,060
Received 2,934 Likes on 1,250 Posts
Why does that not suprise me
NutLoose is online now  
Old 22nd Jun 2012, 17:51
  #3 (permalink)  
Red On, Green On
 
Join Date: May 2004
Location: Between the woods and the water
Age: 24
Posts: 6,487
Likes: 0
Received 2 Likes on 2 Posts
Now they really won't be on time. Spanish practices and all that.
airborne_artist is offline  
Old 22nd Jun 2012, 17:53
  #4 (permalink)  
 
Join Date: Sep 2006
Location: Up the road a ways, yonder
Age: 54
Posts: 29
Likes: 0
Received 0 Likes on 0 Posts
On the bright side Lewis Page should be able to write a new book.
frg7700 is offline  
Old 22nd Jun 2012, 17:56
  #5 (permalink)  
 
Join Date: Apr 2006
Location: UK
Posts: 60
Likes: 0
Received 0 Likes on 0 Posts
if the spanish can knock em out on time even with their 1400 stack, then we should be doing some kind of time and motion study to find out how they achieve so much in such a sort working day.

...or maybe they'll be late...and a bit shabby here and there!
Corrona is offline  
Old 22nd Jun 2012, 18:43
  #6 (permalink)  
 
Join Date: Oct 2005
Location: Anglia
Posts: 2,076
Received 6 Likes on 5 Posts
Cobham had been advertising for staff ranging from mechanics to quality engineers for the last year or more - the paltry pay offered for all roles suggested that the job was going abroad (or the whole contract was going South).
As the ATr contract has no loyalty links with UK all the scheduled work could go anywhere - the last "C" Check (on the one at BZN) was done by Monarch at Manchester a few weeeks ago.
The Airlines I worked with farmed out maintenance checks to the cheapest biddder - wherever! Look out for Lithuania and Poland.

So it looks like the only ATr Maintenance will be "Light & Line" - done in a (EASA Approved) line facility, no doubt.
Rigga is offline  
Old 22nd Jun 2012, 19:43
  #7 (permalink)  
 
Join Date: Apr 2007
Location: Away from home Rat
Posts: 1
Likes: 0
Received 0 Likes on 0 Posts
Bet you the Spanish will employ a lot of British connies to do it, cos generally their guys are sh*te metal worker and the conversions are mostly detail sheet work... Spanish connie working in my place didn't even know what a hi-lok was!!

Know a few guys who lost their jobs today..
Alber Ratman is offline  
Old 22nd Jun 2012, 21:11
  #8 (permalink)  
Just another erk
 
Join Date: Mar 2007
Location: Germany
Age: 77
Posts: 280
Likes: 0
Received 0 Likes on 0 Posts
Worked on the Aussie A330 MRTT (flight test) at Getafe for 3 1/2 years, the guys doing the work always came out on time, ok they did swap the pods on me once, and messed up the calibrations, but once we found the problem, no problem, there are some good mech's, ect out there.

Last edited by ArthurR; 22nd Jun 2012 at 21:15.
ArthurR is offline  
Old 22nd Jun 2012, 22:09
  #9 (permalink)  
 
Join Date: Oct 2011
Location: Mos Eisley
Age: 48
Posts: 113
Likes: 0
Received 0 Likes on 0 Posts
The tanker planes, which are 60 metres long, can carry 100,000 litres of fuel and pass it on to other planes at a rate of 5,000 litres a minute.
Is that a fact? Or just the design aspiration?
OafOrfUxAche is offline  
Old 22nd Jun 2012, 22:24
  #10 (permalink)  
 
Join Date: Jan 2005
Location: N. Spain
Age: 79
Posts: 1,311
Likes: 0
Received 0 Likes on 0 Posts
Worked on the Aussie A330 MRTT (flight test) at Getafe for 3 1/2 years, the guys doing the work always came out on time, ok they did swap the pods on me once, and messed up the calibrations, but once we found the problem, no problem, there are some good mech's, ect out there.
Arthur, how could you? Obviously speaking from experience but now you've upset some little Englanders. Crap day for the guys who lost their jobs.

"Short working day" "Generally their guys are sh*te metal workers" etc.

Ah well, back to the other jokes thread.

Last edited by Shack37; 22nd Jun 2012 at 22:36.
Shack37 is offline  
Old 23rd Jun 2012, 09:15
  #11 (permalink)  
 
Join Date: Nov 2001
Location: uk
Posts: 358
Likes: 0
Received 0 Likes on 0 Posts
Scroood again. Why can't the procurement folk negotiate safeguards into contracts properly? In the private sector, you'd be fired for a lapse such as this. MoD et al, NUL POINTS>

Last edited by chippy63; 23rd Jun 2012 at 09:22.
chippy63 is offline  
Old 23rd Jun 2012, 10:54
  #12 (permalink)  

Champagne anyone...?
 
Join Date: Oct 1999
Location: EGDL
Age: 54
Posts: 1,420
Received 0 Likes on 0 Posts
I think Cobham just bit off more than they could chew with this one.
StopStart is offline  
Old 23rd Jun 2012, 14:41
  #13 (permalink)  
 
Join Date: Feb 2000
Location: UK
Posts: 608
Received 5 Likes on 3 Posts
Woddya expect when HMG sells their stake in EADS?
The work goes to the countries that have a stake in the company.
I would expect there to be no EADS/Airbus work in the UK at all as soon as the rest can arrange it.

Doc C
Doctor Cruces is offline  
Old 23rd Jun 2012, 14:47
  #14 (permalink)  
Just another erk
 
Join Date: Mar 2007
Location: Germany
Age: 77
Posts: 280
Likes: 0
Received 0 Likes on 0 Posts
From the Telegraph
"The change means that up to 320 UK jobs will unfortunately go - this affects 237 Cobham jobs and those of 83 contractors - and the change will happen by the end of the first quarter of next year,"
Fact is there are 237 jobs lost, most of the contractors will be looking for new jobs now, and then leaving on an hours notice, wish I could have got 6 months notice when contracting, best I got was a months, and that was in Germany, in UK minimum 1 hours notice either way.
ArthurR is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.