Go Back  PPRuNe Forums > Aircrew Forums > Military Aviation
Reload this Page >

F-35 progam testing delay causes rise in cost per unit.

Wikiposts
Search
Military Aviation A forum for the professionals who fly military hardware. Also for the backroom boys and girls who support the flying and maintain the equipment, and without whom nothing would ever leave the ground. All armies, navies and air forces of the world equally welcome here.

F-35 progam testing delay causes rise in cost per unit.

Thread Tools
 
Search this Thread
 
Old 21st Jan 2010, 18:32
  #1 (permalink)  
Thread Starter
 
Join Date: Feb 2009
Location: new york
Posts: 60
Likes: 0
Received 0 Likes on 0 Posts
F-35 progam testing delay causes rise in cost per unit.

How long will the "period" last according to Schwartz?

Rising costs of F-35's


CUBE
Rubicks13 is offline  
Old 22nd Jan 2010, 07:57
  #2 (permalink)  
Ecce Homo! Loquitur...
 
Join Date: Jul 2000
Location: Peripatetic
Posts: 17,446
Received 1,603 Likes on 735 Posts
AWST (Ares) - Bill Sweetman: Pentagon Watchdog Sinks Fangs Into JSF

Relax, JSF fans. I'm not going to bash the program here.

I'm standing to one side and letting the Director, Operational Test and Evaluation do the job for me. [AWIN subscribers go here for our story on the report. To see the USAF chief of staff's response, see our story here.]

DOT&E reports are not classified but are not issued online. Still, the Fiscal 2009 report on JSF is the most pessimistic official study of the program to be published so far.

Its headline conclusion is that even with favorable test results, more test aircraft and more funding, initial operational test and evaluation "could be" finished by early-to-mid 2016 - 18 months behind today's schedule.

The report raises other concerns. The configuration of the low rate initial production (LRIP) aircraft that are due to carry out OT&E has not been defined, and the DOT&E is concerned that their capabilities will not be representative of production aircraft.

Modeling and simulation - which the JSF team has touted as the secret weapon that will allow the project to be completed on time and on schedule, despite recent history - is at an early stage, says the DOT&E. The problem is that most of the labs and models have not been accredited - that is, accepted as valid substitutes for aircraft testing. For this to happen, the report says, the lab performance needs to be verified by "hardware and software-in-the-loop ground and flight tests" and DOT&E cautions against a tendency to use models before they are ready.

There is a litany of current problems, including more clutch heating discovered in last year's hover-pit tests, increasing take-off speeds for the F-35C - now hitting tire limits - and software instability. Thermal management is still a problem. The inter-service JSF Operational Testing Team (JOTT) says that the program "is on track to achieve operational effectiveness requirements but not operational suitability requirements."

The DOT&E also notes that some key assumptions underlying the flight-test schedule remain to be proven. In 2007, the JSF program sharply reduced the planned number of flight tests, arguing - for example - that the different variants will be similar enough to allow for common tests in some parts of the envelope: DOT&E says this is still to be proven.

Also highlighted is the potential vulnerability of the JSF to battle damage. To save weight, the JSF program office has removed safety check valves from "fueldraulic" lines that actuate the engine nozzle, and has also reduced the number of fire extinguishers, and the DOT&E is concerned that the jet will be vulnerable to fire if hit. Other tests have shown that battle damage to controls could cause "loss of aircraft and pilot". Live-fire tests with prototype AA-1 are expected to clarify these issues.

It's fair to say at this point that DOT&E is expected to be critical of new programs. The office was established by Congress in 1983 after a series of procurement failures, as an independent watchdog reporting directly to the Office of the Secretary of Defense. (The current DOT&E is a nuclear scientist, Dr Michael Gilmore.) Lockheed Martin points out that the report precedes some recent milestones, and reiterates its point that the program's recent delays were driven by the late delivery of aircraft - a problem that the company says is betting better.

Historically, though, the DOT&E's predictions have seldom turned out to be inaccurate - glass-half-full as they may be. And I don't recall when DOT&E has been as much at odds with the "official" schedule as it is today on the F-35.
ORAC is online now  
Old 25th Jan 2010, 22:26
  #3 (permalink)  
 
Join Date: May 2009
Location: England
Posts: 29
Likes: 0
Received 0 Likes on 0 Posts
F35B delays and costs

Just replied to the other thread as well.

The F35B is late and getting later..

From a UK perspective, a few years ago the story was that Typhoon was busting the budget at ~£60M-ish a pop, and the JSF STOVL would pitch in 'substantially' less (and with the bigger bomb bay). Now we know its different.

That LiftSystem is so complicated - it's been tough getting the test flights going, but what about when in service, what with the sand and salt, the thermal loading, clutch wear... the running costs will make the RAF yearn for the simple pleasures of the Typhoon and Tornado (let alone Jaguar, Hawk etc etc)

As I said ... watch this space there's more to come!



cheers!
Tom Laxey is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.