Go Back  PPRuNe Forums > Aircrew Forums > Military Aviation
Reload this Page >

Typhoon Tranche 2 First Flight

Wikiposts
Search
Military Aviation A forum for the professionals who fly military hardware. Also for the backroom boys and girls who support the flying and maintain the equipment, and without whom nothing would ever leave the ground. All armies, navies and air forces of the world equally welcome here.

Typhoon Tranche 2 First Flight

Thread Tools
 
Search this Thread
 
Old 18th Jan 2008, 10:39
  #1 (permalink)  
Ecce Homo! Loquitur...
Thread Starter
 
Join Date: Jul 2000
Location: Peripatetic
Posts: 17,466
Received 1,626 Likes on 743 Posts
Typhoon Tranche 2 First Flight

First Tranche 2 Eurofighter Typhoon Has Flown
Eurofighter GmgH | Jan 18, 2008

HALLBERGMOOS, Germany: The first Tranche 2 Eurofighter Typhoon has made its first flight at EADS Military Air Systems' site in Manching. Instrumented Production Aircraft Seven (IPA7) was piloted by EADS Test Pilot Chris Worning.

The aircraft, a German single seat variant, represents the full Tranche 2 build standard and its first prominent task will be to accomplish Type Acceptance for Block 8, the first capability standard of Tranche 2, in April 2008. This work will be carried out together with the BAE Systems-operated IPA6 based at Warton. IPA6 (BS031) is essentially a Tranche 1 standard aircraft but utilises the full Tranche 2 mission computer suite and avionics features. The first series of EJ200 engine flight testing for Tranche 2 was successfully concluded at the end of November with IPA2 in Italy.

The significant Tranche 2 capabilities focus mainly on the new mission computers which deliver the higher processing and memory capacity required for the integration of future weapons such as Meteor, Storm Shadow and Taurus. Differences in the build standard to Tranche 1 are related to changes in production technology or obsolescence.

Based on the Tranche 2 production contract, signed on 14 December 2004, and the original export contract with Austria, the Eurofighter consortium will deliver 251 Tranche 2 weapon systems: 93 to the United Kingdom, 75 to Germany, 48 to Italy and 35 to Spain. The difference to the original figure of 236 is based on the delivery of 15 Tranche 1 aircraft to Austria, for which the nations receive aircraft originally ordered by Austria in Tranche 2.

Deliveries of Tranche 2 Eurofighter Typhoons to all four Partner Nations will begin in Summer 2008 and are scheduled to run until 2013. 32 aircraft are already in final assembly at the partner companies Alenia Aeronautica, BAE Systems, EADS CASA and EADS Deutschland.................
ORAC is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.