Go Back  PPRuNe Forums > Other Aircrew Forums > Flight Testing
Reload this Page >

Jetmagic - ERJ 135 - London City

Wikiposts
Search

Notices
Flight Testing A forum for test pilots, flight test engineers, observers, telemetry and instrumentation engineers and anybody else involved in the demanding and complex business of testing aeroplanes, helicopters and equipment.

Jetmagic - ERJ 135 - London City

Thread Tools
 
Search this Thread
 
Old 18th May 2003 | 04:26
  #1 (permalink)  
Thread Starter
 
Joined: Aug 2000
Posts: 1,625
Likes: 0
From: Cork, Ireland
Question Jetmagic - ERJ 135 - London City

What kind of flight testing operations have to be done and gone through before an aircraft like the Embraer ERJ 135 will be certificated to operate from Cork to London City. At first glance the runway at LCY appears to be quite short for '135 flying so how does a new carrier like Jetmagic and, presumably, Embraer hope to succeed in having operations cleared for take off, so to speak. Light fuel loads, pax restrictions, short flight to Cork??

Being from Cork I hope all these hurdles can be overcome by Jetmagic.
Tom the Tenor is offline  
Old 18th May 2003 | 14:51
  #2 (permalink)  
100 Countries Visited
25 Anniversary
 
Joined: Sep 1999
Posts: 5,552
Likes: 25
From: ME
Tom,

I believe that the problems have to do with the approach requirements rather than the ability to stop on the tarmac. The approach gradient is double the normal standard.


Mutt.
mutt is offline  
Old 20th May 2003 | 12:10
  #3 (permalink)  
 
Joined: Apr 2002
Posts: 734
Likes: 0
From: Nirvana South
You have to meet NPA-28 (if memory serves - don't have my files at home) - it was known as NPA-SAL. The main thing is, apart from demonstrating correct operations on the approach you want, you have to show that you can do an approach 2 degrees steeper without the throttles going to idle - not easy in a jet.
I know someone who was on the dash-8 400 LCY cert and they used a private airfield in eastern California that allowed them to set up not only the normal 5.5 degrees but also the 7.5 required.
They also then had to go and do it for real at LCY. He said a big problem for them was the length of their aircraft & manouvering around at City - apparently there's not a lot of apron space.

Last edited by ICT_SLB; 21st May 2003 at 11:27.
ICT_SLB is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.