Go Back  PPRuNe Forums > Other Aircrew Forums > Flight Testing
Reload this Page >

Supersonic Harrier

Wikiposts
Search

Notices
Flight Testing A forum for test pilots, flight test engineers, observers, telemetry and instrumentation engineers and anybody else involved in the demanding and complex business of testing aeroplanes, helicopters and equipment.

Supersonic Harrier

Thread Tools
 
Search this Thread
 
Old 25th May 2012 | 11:56
  #1 (permalink)  
Thread Starter
 
Joined: May 2012
Posts: 11
Likes: 0
From: london
Supersonic Harrier

Was the demise of this project technical or political?
GR3a is offline  
Reply
Old 25th May 2012 | 15:10
  #2 (permalink)  
Moderator
30 Countries Visited
25 Anniversary
Veteran: Reserves
 
Joined: Feb 2000
Aviation Qualifications: CPL
Posts: 14,480
Likes: 178
From: UK
I thought that the SHAR would do around 1.2 clean?

G
Genghis the Engineer is offline  
Reply
Old 25th May 2012 | 16:30
  #3 (permalink)  
 
Joined: Jul 2007
Posts: 1,158
Likes: 62
From: 51.50N 1W (ish)
I believe the OP is referring to the P1154, under construction in 1965.

The Labour Government (not implying that another colour of politician would have been any better) could afford one out of Concorde, TSR2 and P1154, and cancelling Concorde was impossible given the treaty with France.
Fitter2 is offline  
Reply
Old 25th May 2012 | 17:50
  #4 (permalink)  
Thread Starter
 
Joined: May 2012
Posts: 11
Likes: 0
From: london
I'm sorry my initial post was pretty lazy as distracted with work.

Yes I was referring to the P1154.

I was reading through this site as a point of reference

[URL="http://www.harrier.org.uk/history/history_p1154.htm"]http://www.harrier.org.uk/history/history_p1154.htm[

I guess asking if it was political or technological question isn't entirely asking it correctly.

With this project cancelled yet the continuation of the subsonic version I had wondered beyond the technological challenge of V/STOL how/why achieving a high Mach number was not pursued. Being simplistic about it, if you are going to have a jump jet why not have one that would also do Mach 2?
GR3a is offline  
Reply
Old 25th May 2012 | 19:12
  #5 (permalink)  
 
Joined: Jan 2012
Posts: 2,173
Likes: 0
From: .
GR3a
the history books suggest that the spec of the RAF and RN requirements became so diverse that one aircraft couldn't do both roles, so the project died as developing both would have been too expensive

However read John Farley's posts on this page
Maybe there was a practical engineering problem as well
http://www.pprune.org/military-aircr...ml#post7144134
Milo Minderbinder is offline  
Reply
Old 29th May 2012 | 13:06
  #6 (permalink)  
15 Anniversary
Veteran: Coast Guard
 
Joined: Aug 2007
Posts: 1,138
Likes: 54
From: virginia, USA
Supersonic V/STOL is possible, but not very practical. Any jet design is a comromise, and V/STOL even much more so. So why it might seem logical to "want" Mach 2 in your design, getting there is quite tough and will come at a cost. The P1154 was to have a complex engine with plenum chamber burning (basically afterburners on the "cold" front nozzles). Other higher speed V/STOL designs were to use multiple engines, or lift engines and other complex arrangements. All of these lead to extra weight, compexity, cost and high fuel consumption. When it comes down to it, most have concluded that they do no "need" MACH 2, especially with the costs/compromises it brings, and you do not need MACH 2 for close air support. If you really need a MACH 2 interceptor, better to have a conventional (non-V/STOL) design.

As proven with the Harrier, the best arrangement for a V/STOL aircraft to date has been a single engine design with a large, vectored, turbofan engine. The size of the fan, the thrust coming out of the engine (a huge volume but at a relatively low velocity) and the intakes limit the top speed of the harrier family.
sandiego89 is offline  
Reply
Old 31st May 2012 | 13:31
  #7 (permalink)  
Thread Starter
 
Joined: May 2012
Posts: 11
Likes: 0
From: london
I can seereally only one other design study that attempted to mate supersonic and VTOLcapability, the Rockwell XFV-12.

Given itcame some time after the abandonment of the P1154 these barriers were seen assomething that could have been over come?
GR3a is offline  
Reply
Old 2nd June 2012 | 17:47
  #8 (permalink)  
 
Joined: Nov 2009
Posts: 577
Likes: 1
From: Dreamland
The XFV-12 didn't have sufficient vertical thrust to justify the V in VTOL. The EWR VJ 101 achieved Mach 1.04, but like the Mirage IIIV (which achieved M1.3) needed specialised lift engines.
Strangely it seems the Europeans had a better hit rate than the US, they just didn't have the ability to go into series production of the prototypes that actually flew, with one spectacular exception.
Harley Quinn is offline  
Reply
Old 9th June 2012 | 09:51
  #9 (permalink)  
Thread Starter
 
Joined: May 2012
Posts: 11
Likes: 0
From: london
Given the pretty large time gaps in all these projects, successful or otherwise, it is incredible the differences in layouts to achieve the same end point and actually the successful harrier design seems not to have been copied.

Is it a reflection upon constant learning or a simple stubborn - ness and desire to be different?
GR3a is offline  
Reply
Old 9th June 2012 | 16:57
  #10 (permalink)  
Thread Starter
 
Joined: May 2012
Posts: 11
Likes: 0
From: london
Thank you for that link it pretty much covers my initial question.

Is the conclusion to be drawn from it all that its taken pretty much 50 years to make a production reality of an aircraft that was conceived with the P1154?
GR3a is offline  
Reply
Old 8th July 2012 | 17:36
  #11 (permalink)  
15 Anniversary
 
Joined: Dec 2006
Posts: 2,486
Likes: 8
From: The No Transgression Zone
pboyall
I remember that thread loved it
Pugilistic Animus is offline  
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.