Go Back  PPRuNe Forums > Ground & Other Ops Forums > Flight/Ground Ops, Crewing and Dispatch
Reload this Page >

Does your airline use Re-Release as a method to save fuel

Wikiposts
Search
Flight/Ground Ops, Crewing and Dispatch A forum for the people who are engaged in operational control/flight dispatch/crewing and their colleagues airside in ramp dispatch, load control and ground handling, to discuss issues directly related to keeping their aircrew and aircraft operational.

Does your airline use Re-Release as a method to save fuel

Thread Tools
 
Search this Thread
 
Old 7th Apr 2007, 04:13
  #1 (permalink)  
Thread Starter
 
Join Date: Jan 2002
Location: Chicago
Posts: 360
Likes: 0
Received 0 Likes on 0 Posts
Does your airline use Re-Release as a method to save fuel

Does your airline use a re-release as a method to save fuel. What are the pros and cons of this procedure?
shon7 is offline  
Old 7th Apr 2007, 04:41
  #2 (permalink)  
 
Join Date: Oct 2006
Location: It wasn't me, I wasn't there, wrong country ;-)
Age: 79
Posts: 1,757
Likes: 0
Received 0 Likes on 0 Posts
Re-release

Standard planning application for long range ops such as EGKK/KOAK for DC8-60s etc. All criteria can be found in the FARs for US ops. For non US ops check yr own ops man.
merlinxx is offline  
Old 7th Apr 2007, 08:18
  #3 (permalink)  
 
Join Date: Oct 2005
Location: England
Posts: 367
Likes: 0
Received 0 Likes on 0 Posts
If you are a US operator then FARs will apply but then you should hold a dispatch licence and therefore you ought not to be asking this question. If you have a JAR AOC then you should consult JAR-OPS1 AMC OPS 1.255 (2) and your company OM Part A (Sec 8). This will refer to the DPP Decision Point Procedure. (An interesting point is that FAA licenced Dispatchers will know all about this whereas a JAR-OPS 1 Ops officer, on the whole, will be ignorant of this. Is this right?) You will need to be compliant with JAR 1.205 and 1.210, does your company have an Ops Procedures Manual? The pros of this procedure is that it can extend range v payload or reduce fuel uplift and consumption where all of the safety factors have been considered. The cons are that highly trained staff are required to administer this yet JAR is very wooley with regards to these training requirements when compared with FARs, a good flight planning system and a robust method of flight watch and communication with your aircraft if flight crew workload is not to be over burdened.
Rgds
EM
Epsilon minus is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.