Wikiposts
Search

Notices
Engineers & Technicians In this day and age of increased CRM and safety awareness, a forum for the guys and girls who keep our a/c serviceable.

Bell 212

Thread Tools
 
Search this Thread
 
Old 6th October 2012 | 05:19
  #1 (permalink)  
Thread Starter
 
Joined: Oct 2012
Posts: 1
Likes: 0
From: India
Bell 212

Can anyone tell me is it necessary to carry out paralleling check after the D.C.U.'s have been swapped or replaced.
cjg412 is offline  
Reply
Old 7th October 2012 | 03:26
  #2 (permalink)  
 
Joined: Jun 2009
Posts: 430
Likes: 0
From: South East Asia
Bell 212

D.C.U.'s, what are these? ALWAYS post helicopter-related matters in the 'Rotorheads' section where you'll more authoritative replies.
Saint Jack is offline  
Reply
Old 7th October 2012 | 10:19
  #3 (permalink)  
15 Anniversary
 
Joined: Oct 2006
Aviation Qualifications: A&P
Posts: 1,346
Likes: 270
From: USA
cjg...

Technically....you should actually perform an operational check of each separate affected DC system prior to any paralleling checks after replacing a DCU...

The M&O was never really clear on this...and if memory is correct it was actually dealt with in Vendor's manuals on DCU.

But straight up... yes...you need to parallel the DCU's if changed out...even if swapped...as the #1 and #2 systems are independent of each other....

w1
wrench1 is offline  
Reply
Old 7th October 2012 | 19:47
  #4 (permalink)  
20 Anniversary
 
Joined: Mar 2004
Posts: 310
Likes: 1
From: Indonesia
The answer is yes do it. Its easy but holding the screwdriver on the tiny adjustment screw with a slottted head is a skill. Refer to BHT212 MM 96-39. The DC electrics in general are from 96-24 on. Worth a read. PB

Last edited by piggybank; 7th October 2012 at 19:47.
piggybank is offline  
Reply
Old 8th October 2012 | 06:31
  #5 (permalink)  
 
Joined: Jun 2012
Posts: 21
Likes: 0
From: Canada
Yeah make sure the plastic insulating sleeve is in place around the test connections where you plug in your multimeter, if the positive probe of your meter shorts out to the case of the DCU it'll fry. This is especially hard on single bus machines since the extra relays are in the way of the number one DCU's probe ports. Don't forget the different voltage setting for cold weather operations.
cbox chip is offline  
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.