145 Repair Station - Away from base work
Thread Starter
Join Date: Jun 2001
Location: USA
Age: 51
Posts: 49
Likes: 0
Received 0 Likes
on
0 Posts
145 Repair Station - Away from base work
Hi,
A question for you.... A repair vendor lets call them X is a 145 certified repair facility. They send a working party away from base to perform repair work at a non 145 repair facility. The work the team from X is performing is being certified and signed off under the 145 of their main base.
My question is..... is there any limit as to what type, quantity and length of time that the away team can perform work under the 145 repair cert at a non 145 location?
Thanks.
A question for you.... A repair vendor lets call them X is a 145 certified repair facility. They send a working party away from base to perform repair work at a non 145 repair facility. The work the team from X is performing is being certified and signed off under the 145 of their main base.
My question is..... is there any limit as to what type, quantity and length of time that the away team can perform work under the 145 repair cert at a non 145 location?
Thanks.
Join Date: May 2004
Location: Balmullo,Scotland
Posts: 933
Likes: 0
Received 0 Likes
on
0 Posts
The part 145 MRO will despatch it's working party IAW their own MOE the terms and conditions as per your question will be contained in there, there would unlikely be a time limit but the depth of work will depend on the approval held by the MRO.
Join Date: Nov 2003
Location: South West
Posts: 172
Likes: 0
Received 0 Likes
on
0 Posts
Also, if repair was to carry on for an extended timescale I would expect the 145's Quality people to get involved - site visit, risk assessment, preventative actions / risk mitigation, QA sign-off if all practical and reasonable actions have been taken to maintain the quality of the working environment, quality of the work being carried out and within the intent of Part 145.