Go Back  PPRuNe Forums > Ground & Other Ops Forums > Engineers & Technicians
Reload this Page >

Should we do what the AMP says?

Wikiposts
Search
Engineers & Technicians In this day and age of increased CRM and safety awareness, a forum for the guys and girls who keep our a/c serviceable.

Should we do what the AMP says?

Thread Tools
 
Search this Thread
 
Old 19th Dec 2009, 09:20
  #21 (permalink)  

Pilots' Pal
Thread Starter
 
Join Date: Nov 1998
Location: USA
Age: 63
Posts: 1,158
Likes: 0
Received 0 Likes on 0 Posts
As I said, I was playing Devil's Advocate; actually, I've been in both scenarios and my take is you comply with the AMP (a). Depending on the type of aircraft, the AMP includes TC, ATA 5, MPD,MRBR, Schedule or whatever recommendations/requirements but the operators can and do add their own. It is approved by the regulator and you comply. The term "overhaul" does not appear, for example, in the 747-400 MPD; the term is "restore" but that includes work up to a full overhaul.
In 2002/3, while auditing and on-site with the conversion of the BA 757s to SF for DHL, the AMP - written by Boeing for DHL - stated the case I mentioned and off came the actuator because a repaired item was fitted during the concurrent "C" check and an "overhauled" item was stipulated.
Component requirements are stipulated in the AMP. I've just been involved in adding carb overhaul stipulations to a BN2 AMP based on an FAA SAIB (match carb overhaul lives with those of the engine) that the UK CAA insisted was included.
Bus429 is offline  
Old 19th Dec 2009, 10:26
  #22 (permalink)  
 
Join Date: Aug 2000
Location: EGGW
Posts: 2,112
Likes: 0
Received 0 Likes on 0 Posts
Just a thought on what l have posted in the past, it is the component management part of the companies technical records department that should spot this problem.
When they update the components records during or after the change, they should spot it has not been overhauled and arrange for said component to be removed and replaced with an overhauled unit.
If needed apply for a variation to the AMP task requirement and if it is already overdue report it to their local authority like good little boys.
Mr @ Spotty M is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.