Go Back  PPRuNe Forums > Ground & Other Ops Forums > Engineers & Technicians
Reload this Page >

Maintenance Decking/Staging

Wikiposts
Search
Engineers & Technicians In this day and age of increased CRM and safety awareness, a forum for the guys and girls who keep our a/c serviceable.

Maintenance Decking/Staging

Thread Tools
 
Search this Thread
 
Old 21st Jan 2009, 13:25
  #1 (permalink)  
Thread Starter
 
Join Date: Jul 2000
Location: Used to be God's own County
Posts: 1,719
Received 14 Likes on 10 Posts
Maintenance Decking/Staging

After some suitable decking/staging for use in helicopter workshop....fed-up of using wobbly step-ladders!
New or used - suggestions welcomed
EESDL is offline  
Old 21st Jan 2009, 14:21
  #2 (permalink)  
 
Join Date: Jul 2001
Location: Earth, I think
Posts: 93
Likes: 0
Received 0 Likes on 0 Posts
Window Cleaning?
loggerhead is offline  
Old 21st Jan 2009, 14:36
  #3 (permalink)  
 
Join Date: Dec 2007
Location: uk
Posts: 188
Likes: 0
Received 0 Likes on 0 Posts
Try searching on Ebay for Aluminium Scaffolding, usually a lot of tower type platforms on there.
Exup is offline  
Old 22nd Jan 2009, 11:50
  #4 (permalink)  
 
Join Date: Feb 2006
Location: Hanging off the end of a thread
Posts: 33,081
Received 2,942 Likes on 1,253 Posts
Air & Ground - Aircraft Staging

Though might be expensive, you want ex military surplus really, though I watched an Airline near me cut up tons of staging and scrap it 12 months ago....



Further to that send a email or contact then off the site and ask if they will have any staging coming up for sale, this is an MOD site.

Disposal Services Authority

Last edited by NutLoose; 22nd Jan 2009 at 12:13.
NutLoose is offline  
Old 25th Jan 2009, 21:45
  #5 (permalink)  
 
Join Date: Oct 2005
Location: Anglia
Posts: 2,076
Received 6 Likes on 5 Posts
Design your own staging!

You dont say what type of heli your working on - Two places I've worked at have had there own designs made by a local company - one made two sets for deep stripping Jetbangers and another place made a very special set for a very special eurocopter!
All you really need to know is what height you want to work at and design your staging to suit.
Remember the rules on the hieght from the floor.
Make sure you divide into suitable movable parts that can join together to make a larger working area.
Add all the things you need (air points, elect points, shelving etc)

Make sure you choose wheels that can move across the area outside too! I learned about that one!
Rigga is offline  
Old 26th Jan 2009, 09:24
  #6 (permalink)  
 
Join Date: Dec 2005
Location: England
Posts: 1,459
Received 34 Likes on 20 Posts
Not only working height but the size of staff need to be taken into account.

Our height ranges are 5'2" to about 6'6".

If you make the stands too small the little guys end up struggling and people put platforms on top of the docks which take them dangerously high relative to the rails.

Too big and the big guys are working hunched up.

Difficult.

Best docks i've seen were the Helikopter service S61N docks in Bergen.

Very safe, lots of working area, aluminium and light enough to be moved by 2 people.
Built in air and power, materials in bins on the dock. Almost a complete wrap around of the aircraft.

Must have cost the earth.
ericferret is offline  
Old 29th Jan 2009, 14:43
  #7 (permalink)  
 
Join Date: May 2001
Location: Mumbai, INDIA
Posts: 445
Likes: 0
Received 0 Likes on 0 Posts
The Variable Hydraulic platforms are excellent.
regds
MEL
HAWK21M is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.