Indian DGCA acceptance of FAA STC's
Anyone know if they accept them unilaterally, or if there is some guidance available?
Could not find much on the DCGA website regarding installation of FAA STC's on
VT registered a/c.
Could not find much on the DCGA website regarding installation of FAA STC's on
VT registered a/c.
Guest
Posts: n/a
was involved in importing several aircraft into India and getting DGCA approvals for STCs after VT registration took much more effort and time than bringing an aircraft with STCs already incorporated. And this extra effort was even necessary if the same conversion / addition was approved previously in India.
"Improving" the application by attaching "consideration" fees helped a lot
"Improving" the application by attaching "consideration" fees helped a lot
Thread Starter
Join Date: Jun 2003
Location: Near LOACH intersection
Posts: 497
Likes: 0
Received 0 Likes
on
0 Posts
Thanks all. I too have imported aircraft with STCs installed with no issues.
Installation of an alteration once on the VT registry is another matter
Installation of an alteration once on the VT registry is another matter
Thread Starter
Join Date: Jun 2003
Location: Near LOACH intersection
Posts: 497
Likes: 0
Received 0 Likes
on
0 Posts
Thanks for the help, I should have asked; "anyone have any actual experience incorporating an FAA STC on a VT aircraft?"
Importing and placing on the registry is an entirely different matter
Relevant info found in GM 21.112B Subpart E
Importing and placing on the registry is an entirely different matter
Relevant info found in GM 21.112B Subpart E
Join Date: Apr 2008
Location: Minneapolis Mn USA
Posts: 91
Likes: 0
Received 0 Likes
on
0 Posts
In the "for what its worth box"; we did a number on interior mods requiring LOPA plus new equipment and revised installation STC's on the same B777's once they were VT registered. The DGCA surveyor and AI engineering boys were good to work with and we had no real problems. The work was accomplished and authorised through a US MRO, and the aircraft left basically on time and with all STC's approved by the FAA and DGCA.