Airbus A319/A320/A321 C2 Check
Thread Starter
Join Date: Jun 2001
Location: USA
Age: 51
Posts: 49
Likes: 0
Received 0 Likes
on
0 Posts
Airbus A319/A320/A321 C2 Check
Hello,
I need help please, I need to know roughly how many man hours and a turn time for carrying out a standard MPD C2 maintenance check.
Thanks.
I need help please, I need to know roughly how many man hours and a turn time for carrying out a standard MPD C2 maintenance check.
Thanks.
Join Date: Aug 2000
Location: EGGW
Posts: 2,112
Likes: 0
Received 0 Likes
on
0 Posts
No such check in the MPD.
The "C" check interval went out a few MPD revisions ago, that was over a year ago, nearer two.
All intervals are now listed in Flight Hours or Flight Cycles or Calendar, or a mix of two or more.
You can package them into a check called "C" or "2C" what ever you like, also the "A" interval went as well.
The "C" check interval went out a few MPD revisions ago, that was over a year ago, nearer two.
All intervals are now listed in Flight Hours or Flight Cycles or Calendar, or a mix of two or more.
You can package them into a check called "C" or "2C" what ever you like, also the "A" interval went as well.
Thread Starter
Join Date: Jun 2001
Location: USA
Age: 51
Posts: 49
Likes: 0
Received 0 Likes
on
0 Posts
So in order to build a package I take the interval set by the airline and build the check package from everything that is due.
For example 20 months/ 6000FH is the interval so a package would include all these checks and all lessor checks due.
Cool I get it. So how many man hours to accomplish the package?
Thanks.
For example 20 months/ 6000FH is the interval so a package would include all these checks and all lessor checks due.
Cool I get it. So how many man hours to accomplish the package?
Thanks.