ZFW
Guest
Posts: n/a
Are you planning on dumping the payload enroute?.
If so then sure you can.
If not consider this, the extra payload would have an impact on the structure during the entire flight, not only on the first 15-20% as would the centre tank fuel.
Perhaps you could increase you payload by as much as 50%, if you substituted the centre tank fuek with extra payload, but perhaps you would reduce the airframe service life by 50%
If so then sure you can.
If not consider this, the extra payload would have an impact on the structure during the entire flight, not only on the first 15-20% as would the centre tank fuel.
Perhaps you could increase you payload by as much as 50%, if you substituted the centre tank fuek with extra payload, but perhaps you would reduce the airframe service life by 50%





