Ive noticed there's alot of construction work at the end of the Sydney virgin terminal pier.

Are they expanding the terminal or re-working the taxi ways?
SARWATCH is offline  
Old 1st Dec 2011, 00:15
  #2 (permalink)  
 
Join Date: Nov 2001
Location: Sydney
Age: 44
Posts: 121
Likes: 0
Received 0 Likes on 0 Posts
sydney airport

both! one leads to the other!
aero979 is offline  
Old 1st Dec 2011, 00:26
  #3 (permalink)  
 
Join Date: Jul 2001
Location: The Ponderosa
Age: 52
Posts: 845
Received 16 Likes on 6 Posts
Just making it a bit more A330 friendly. Soon we'll have 4.
hoss is offline  
Old 1st Dec 2011, 00:28
  #4 (permalink)  
Thread Starter
 
Join Date: Sep 2009
Location: Sydney
Posts: 4
Likes: 0
Received 0 Likes on 0 Posts
Anyone got plans on how the final product will look?
SARWATCH is offline  
Old 1st Dec 2011, 23:33
  #5 (permalink)  
 
Join Date: Sep 2000
Location: NSW Australia
Posts: 40
Received 3 Likes on 1 Post
Have had a brief look at the drawings - 5 extra bays in total, at least a couple of which are A330/B787 compliant. Looks like 3 out of the 5 will push-back onto taxiway Golf, which will be a pain in the @rse for ATC.
keepemseperated is offline  
Old 2nd Dec 2011, 10:42
  #6 (permalink)  
 
Join Date: Nov 1999
Location: Somewhere new.....
Posts: 245
Received 0 Likes on 0 Posts
And the airport will still not be able to cope!
Stiff Under Carriage is offline  
Old 2nd Dec 2011, 12:05
  #7 (permalink)  
 
Join Date: Jul 2005
Location: Next to Bay 8
Posts: 247
Likes: 0
Received 0 Likes on 0 Posts
I don't know if this work will be bringing the pier into line with the 2025 or 2050 (or whatever it is) masterplan. The work involved in that reconstruction is very extensive. From what I've heard they're just adding tarmac and 2 widebody bays & aerobridges to the end of the pier. This will allow 3 A330s to park there simultaneously, which is plenty for now. The question is, will there be any adjustments to the terminal itself? Adding another 2 widebody bays without adding any passenger waiting areas is going to cause nightmares. As it is it's already an overcrowded area at the end of that pier.

Does anyone know whether any terminal upgrades are in store, or is it just a ' tack 2 more A330 bays on' sorta deal???
OhForSure is offline  
Old 2nd Dec 2011, 22:29
  #8 (permalink)  
 
Join Date: Sep 2000
Location: NSW Australia
Posts: 40
Received 3 Likes on 1 Post
OhForSure - the plans that I have seen include and extension of the pier, beyond the current 'rotunda' with additional seating/facilities for the extra 5 bays (i.e. Bays 41 to 45). They all have aero bridges, and it looks as though a couple of the bays will be able to accessed by 2 bridges at the same time.

Not sure if this is part of the master plan or not.

As an aside, I believe an announcement will be made on Monday re terminals and expansion plans.
keepemseperated is offline  
Old 2nd Dec 2011, 23:26
  #9 (permalink)  
Sprucegoose
 
Join Date: Sep 2000
Location: Hughes Point, where life is great! Was also resident on page 13, but now I'm lost in Cyberspace....
Age: 59
Posts: 3,485
Likes: 0
Received 1 Like on 1 Post
Looks like 3 out of the 5 will push-back onto taxiway Golf,
I have heard they will pushing back on to Charlie!

Airline schedulers will need to add another ten minutes to block times.
Howard Hughes is offline  
Old 4th Dec 2011, 06:34
  #10 (permalink)  
 
Join Date: Sep 2000
Location: NSW Australia
Posts: 40
Received 3 Likes on 1 Post
That's a long push from Dom2 or 3 onto taxiway C. A good 400 metres in the case of Dom3!

I reckon they meant taxiway G.
keepemseperated is offline  
Old 26th Feb 2012, 10:40
  #11 (permalink)  
 
Join Date: Jul 2005
Location: Next to Bay 8
Posts: 247
Likes: 0
Received 0 Likes on 0 Posts
Anyone heard or seen anything else regarding the eastern pier extension/expansion??? It seems strange that there is NOTHING on the web about it... no artists impressions etc. Does anyone have any details on the project? It seems to be moving along at a reasonable rate.
OhForSure is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.