Go Back  PPRuNe Forums > PPRuNe Worldwide > Australia, New Zealand & the Pacific
Reload this Page >

PERTH: It's All Going To Happen...

Wikiposts
Search
Australia, New Zealand & the Pacific Airline and RPT Rumours & News in Australia, enZed and the Pacific

PERTH: It's All Going To Happen...

Thread Tools
 
Search this Thread
 
Old 31st Mar 2013, 09:18
  #61 (permalink)  
 
Join Date: Aug 2005
Location: PPrune nominee 2011!
Posts: 1,561
Likes: 0
Received 0 Likes on 0 Posts
Trouble is the government will only throw just enough money at the embarrassment
Its not owned by the Government
Skystar320 is offline  
Old 31st Mar 2013, 13:29
  #62 (permalink)  
 
Join Date: Oct 2002
Location: The Coal Face
Posts: 1,296
Received 332 Likes on 126 Posts
Its not owned by the Government
Yeah, sorry about that. Its embarrassing.
Chronic Snoozer is offline  
Old 31st Mar 2013, 21:06
  #63 (permalink)  
 
Join Date: Aug 2007
Location: Australia
Age: 82
Posts: 259
Likes: 0
Received 21 Likes on 5 Posts
Try out Cairns Terminal

Before all of you really complain too much about Perth's terminal you should go as a passenger to and from Cairns Airport.
It is a bloody shambles and an utter disgrace.
I have never seen such a disfunctional Terminal in all of my many years flying and travelling.
Sure Perth is not too flash but it's one hell of a lot better that Cairns.
That does not excuse the authorities from improving Perth but at least you know you are far from the worst International Airport/ Domestic Airport in Australia.
RodH is offline  
Old 23rd May 2013, 14:49
  #64 (permalink)  
 
Join Date: Apr 2010
Location: home
Posts: 516
Received 21 Likes on 9 Posts
I think young Geoffrey has certain alliances/agendas
airdualbleedfault is offline  
Old 24th May 2013, 04:55
  #65 (permalink)  
 
Join Date: Feb 2009
Location: ward 8
Posts: 45
Likes: 0
Received 0 Likes on 0 Posts
YPPH ALA

500 mil spend, yeah right.

This will be one project that will probably go UNDER-budget.

I started work at the "field" circa 1980 and had seen changes to the current plan going from that time until 1984, then terminating with the current mess (plan) unchanged from 1988 until the present time. Actually thats not true, there was the much celebrated (though invisible and unused) $2.3 million smokers shed installed last year somewhere.

late and under budget
AU-501 is offline  
Old 24th May 2013, 14:51
  #66 (permalink)  
 
Join Date: Aug 2002
Location: WLG (FORMERLY PER)
Posts: 1,195
Likes: 0
Received 5 Likes on 5 Posts
Sorry to add some facts to the debate...https://www.mainroads.wa.gov.au/BUIL...GatewayWA.aspx

Last edited by topend3; 24th May 2013 at 14:52.
topend3 is offline  
Old 24th May 2013, 15:28
  #67 (permalink)  
 
Join Date: Apr 2011
Location: Cairns Australia
Posts: 124
Likes: 0
Received 0 Likes on 0 Posts
RodH,

What do you have against Cairns airport?
I use it frequently and have no issues with it both terminals are quick to get to gate area and screening lines are fairly short and when exiting both have a taxi line 100m from the door. Its a hassle free airport now the refurb is all done.
jarden is offline  
Old 25th May 2013, 13:12
  #68 (permalink)  
 
Join Date: May 2013
Location: Mostly here, sometimes over there...
Posts: 373
Received 63 Likes on 19 Posts
Oh?
So it's now quick and hassle-free to transfer from domestic to an international connection then?
Buttscratcher is offline  
Old 25th May 2013, 14:39
  #69 (permalink)  
Moderator
 
Join Date: Jun 2001
Location: Australia
Posts: 1,127
Received 22 Likes on 8 Posts
It is owned by the federal government but is leased to Perth Airport P/L. Albanese is the landlord...complain to him and you will get a nice letter from someone saying the Minister has asked them to reply on his behalf
Charlie Foxtrot India is offline  
Old 28th May 2013, 16:00
  #70 (permalink)  
 
Join Date: Apr 2009
Location: London-Thailand-Australia
Age: 15
Posts: 1,057
Received 0 Likes on 0 Posts
Qantas to lift investment in WA - Alan Joyce


TIMA9X is offline  
Old 28th May 2013, 22:46
  #71 (permalink)  
 
Join Date: Apr 2008
Location: On a long enough timeline the survival rate for everyone is zero
Posts: 731
Likes: 0
Received 0 Likes on 0 Posts
TIMA9x, I guess Alan didn't receive the Ross Garnaut memo on China & the future of the resources boom from the day before the announcement.

The Ross Garnaut Peter Jonson podcast is here (accompanying chartpack: Monetary Policy Ross Garnaut Uni Melb 240513v1.pdf - chart 19 Tourism is interesting, and shows the massive decline for inbound tourism over the last 10 years).

Interesting contrast between the two views on the future, and only one can be right.

Last edited by breakfastburrito; 28th May 2013 at 23:38.
breakfastburrito is offline  
Old 29th May 2013, 01:44
  #72 (permalink)  
Thread Starter
 
Join Date: Mar 2002
Location: Seat 1A
Posts: 8,556
Received 75 Likes on 43 Posts
From The West, 28 May:

Capn Bloggs is offline  
Old 29th May 2013, 02:02
  #73 (permalink)  
 
Join Date: Dec 2001
Location: Brisvegas
Posts: 3,878
Likes: 0
Received 246 Likes on 106 Posts
I notice that Big Al talked about "resource contracts" mmmmm.

How much work are the Network F100s doing at the moment?
Icarus2001 is offline  
Old 29th May 2013, 08:43
  #74 (permalink)  
 
Join Date: Apr 2010
Location: Brisbane
Age: 58
Posts: 268
Received 32 Likes on 27 Posts
Its not owned by the Government
Actually Perth airport is owned by the Government, they just leased it for 50 years .
markis10 is offline  
Old 29th May 2013, 09:16
  #75 (permalink)  
 
Join Date: Dec 2001
Location: Brisvegas
Posts: 3,878
Likes: 0
Received 246 Likes on 106 Posts
99 years actually. Never let the facts spoil a good story.

CFI told you above...

Here it is again...

FAQs

Last edited by Icarus2001; 29th May 2013 at 09:23.
Icarus2001 is offline  
Old 30th May 2013, 10:23
  #76 (permalink)  
 
Join Date: Apr 2002
Location: shoe box
Posts: 380
Received 0 Likes on 0 Posts
Did someone forget to tell the Irishman that the mining boom is over?
The mining boom is over
Sue Ridgepipe is online now  
Old 30th May 2013, 23:15
  #77 (permalink)  
 
Join Date: Oct 2011
Location: WA
Age: 71
Posts: 140
Likes: 0
Received 0 Likes on 0 Posts
It never ceases to amaze me how people fail to see the difference between construction (of minesites) and actual mining. It all just gets lumped into one big bucket. You can't keep building new stuff forever, but, when the mines are all operational, guess what? They still employ a lot of people. Not as many as that short construction phase, but that's the nature of construction. Even down to the social implications-- a lot of the criticism thrown at "miners" re behaviour on flights, in camps, etc, is down to construction workers, building minesites. There is a world of difference between construction camps and established mine camps, believe me.
Anyway, back on topic. When the building is done, the mines operate. They still put a lot of bums on aircraft seats. And will continue to do so. A more accurate description would be "THE CURRENT CONSTRUCTION BOOM IS NEARING ITS END"
ranmar850 is offline  
Old 31st May 2013, 02:47
  #78 (permalink)  
 
Join Date: Apr 2009
Location: Budapest
Posts: 77
Received 0 Likes on 0 Posts
I recently read an article that said a certain gas plant required 3000 workers to build it but once they start producing gas it only takes 30 workers per shift to run it!!!!I think in anyone's terms that is a big difference in manning levels between the construction and operational phases!!!
cynphil is offline  
Old 31st May 2013, 04:16
  #79 (permalink)  
 
Join Date: Oct 2011
Location: WA
Age: 71
Posts: 140
Likes: 0
Received 0 Likes on 0 Posts
Yes, that is one valid example, but I can give another equally valid one. Around a thousand people, maybe, were employed during the construction of the mine I work on. Although not all at the same time. Now the mine is working, we have ( at last count) nearly 800 full time employees. All being flown in and out, either 9/5 or 2/1. And the multiplier effect--a significant proportion of those people don't live in Perth. So they have to be flown TO Perth, either from the WA regions (my case) , or from other parts of Australia. And then, some of those who have to join a flight at the capital city of their state, actually do a regional flight within their state to get to the capital city. Do you see what I am getting at?
The projected life of this mine is another 25 years, barring further discoveries within the lease, or available nearby, with extended infrastructure. Oil and gas do not tend to be big direct employers in the production phase, more technology-intensive. But those 30 people need a lot in the way of support industry, particularly if the site is offshore.

The high point of the construction phase may be past, now we will settle into a production phase(but the capex won't stop dead, believe me.)
ranmar850 is offline  
Old 1st Jun 2013, 11:45
  #80 (permalink)  
 
Join Date: Dec 2012
Location: nowhere
Posts: 151
Likes: 0
Received 0 Likes on 0 Posts
ranmar850

Maybe you should get your facts right as well.

Gorgon: construction finishes in 2-3 yrs requirement for 4 a/c will fall to 1.5.

Wheatstone: when it's finished will face similar falls. Operations require around only 1/3 of the number of workers as the construction phase.
ANCPER is offline  


Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.