Qf Line Station Managers Retiring?
Thread Starter
Join Date: Mar 2007
Location: OZ
Posts: 282
Likes: 0
Received 0 Likes
on
0 Posts
Qf Line Station Managers Retiring?
Heard today QF Engineering Line Station Managers for S"pore and Jakarta told to retire, and won't be replaced.
Any other stations effected?
Any other stations effected?
My understanding is that SIN & CGK are the last of the Asian ports to lose QF engineers - BKK went to CX engineers last year, HKG has been HAECO for a long time. The whole operation will be managed by the head of engineering in LAX.
Losing our own staff in SIN is a huge surprise as we have a large number of flights which over the years has lead to some major engineering challenges.
This looks like another one of Boston Consulting Group's ideas to reduce costs irrespective of the long term consequences.
Losing our own staff in SIN is a huge surprise as we have a large number of flights which over the years has lead to some major engineering challenges.
This looks like another one of Boston Consulting Group's ideas to reduce costs irrespective of the long term consequences.
Join Date: May 2008
Location: oz
Posts: 106
Likes: 0
Received 0 Likes
on
0 Posts
All part of the cunning plan.Cathay now has the bulk of international contracts in BNE also.Wouldn't be surprised to see the QF work handed to third parties in mainland OZ either. An interesting year ahead with a new broom at the helm of QF engineering,hope he has more nous than his predescessor.
Thread Starter
Join Date: Mar 2007
Location: OZ
Posts: 282
Likes: 0
Received 0 Likes
on
0 Posts
Only the Manager
It is only the Manager retiring in S'pore.
The other LAMEs will be staying on for now.
SIAEC is only doing the QF31/32 if its an A380, and soon the morning A330 departure.
I think the manager was the only QF staff in Jakarta, but could be wrong.
The other LAMEs will be staying on for now.
SIAEC is only doing the QF31/32 if its an A380, and soon the morning A330 departure.
I think the manager was the only QF staff in Jakarta, but could be wrong.
Join Date: Jul 2008
Location: melbourne
Posts: 164
Likes: 0
Received 0 Likes
on
0 Posts
The question remains were they pushed ?
They are going to be replaced in the interim with ops managers,(gutrash and ozzie).
All thanks to t.c and whip on passing down valued line experience to the up and coming station engineers. More importantly when and where is the piss up ?
They are going to be replaced in the interim with ops managers,(gutrash and ozzie).
All thanks to t.c and whip on passing down valued line experience to the up and coming station engineers. More importantly when and where is the piss up ?
who needs a line station run by lames pushing 70+?
Young wipper snappers can do it much better. Just ask them!!
Join Date: Dec 2007
Location: qld
Posts: 1
Likes: 0
Received 0 Likes
on
0 Posts
Quote:
Young wipper snappers can do it much better. Just ask them!!
Thats why theres F**k All LAMES You guys are holding on for the last breath till u get ur close car park and ID90 for life go on retire live with your wife after 20 + years of shift work youll love it NOT
MOVE ON OLD BOY ----- LET GO..............
Ps Your son will love that tool box your going to hand down Lockwire pilers are handy around the house!!!!
Young wipper snappers can do it much better. Just ask them!!
Thats why theres F**k All LAMES You guys are holding on for the last breath till u get ur close car park and ID90 for life go on retire live with your wife after 20 + years of shift work youll love it NOT
MOVE ON OLD BOY ----- LET GO..............
Ps Your son will love that tool box your going to hand down Lockwire pilers are handy around the house!!!!