So Luton want to build another control tower only 10 years after the latest one was opened. This is all part of project 2030 which maybe should be called project 2012. By that date, if the airport get their way, a second parallel 3000 runway will be opened some 950m south of the exiting one together with a new terminal and apron. The old runway will remain open for business jets but how will London’s airspace cope with a two runway Luton used by a projected 30m passengers as well as a two runway Stansted and a three runway Heathrow? Can Northolt remain open?
LTNman is offline  
Old 28th October 2005 | 10:28
  #2 (permalink)  

More than just an ATCO
 
Joined: Jul 1999
Posts: 1,773
Likes: 1
From: Up someone's nose
Things don't change much do they?
When I was a member of Fred Pinchin's Flying Circus (aka Luton Flying Club) back in 1960s there was a model of the proposed expansion in the old clubhouse.
The idea of a new runway has been knocked on the head several times in the past, can't see it making it this time either as the NIMBYs have seen that those near Stanstead and Cliffe have blocked plans for there
Lon More is offline  
Old 28th October 2005 | 10:49
  #3 (permalink)  
20 Anniversary
 
Joined: Jan 2005
Posts: 70
Likes: 0
From: Milton Keynes
LTNman says: "... a second parallel 3000 runway will be opened some 950m south of the exiting one together with a new terminal and apron. The old runway will remain open for business jets ..."

Where does that information come from? Surely the new runway is supposed to be a replacement runway, and the old one just held in reserve for emergencies and possible use after 2031.
antilla is offline  
Old 28th October 2005 | 11:33
  #4 (permalink)  
20 Anniversary
 
Joined: Apr 2001
Posts: 459
Likes: 1
From: A Virtual World!
Use of Old Runway by BizJets

LTNMAN - I think you need to look at Page 38 para 5.18 of the Master Plan. Such use is not at all certain.

This states "Limited continued use of the existing runway for these aircraft movements (cargo, business aviation, maintenance and positioning), beyond 2015, would mean that London Luton Airport could continue to offer services to business aviation customers, and maintenance, whilst dedicating the use of the replacement runway to commercial passenger traffic and cargo. Whilst this proposal does not form part of our "reference case", we would like to continually review this opportunity in conjunction with our business partners and the appropriate authorities and stakeholders."

In other words they are flying a kite!
OLNEY 1 BRAVO is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.