Go Back  PPRuNe Forums > Ground & Other Ops Forums > ATC Issues
Reload this Page >

Expediting through levels

Wikiposts
Search
ATC Issues A place where pilots may enter the 'lions den' that is Air Traffic Control in complete safety and find out the answers to all those obscure topics which you always wanted to know the answer to but were afraid to ask.

Expediting through levels

Thread Tools
 
Search this Thread
 
Old 1st Jan 2002, 23:41
  #1 (permalink)  
Thread Starter
 
Join Date: Jul 2000
Location: Red Feather Club
Posts: 108
Likes: 0
Received 0 Likes on 0 Posts
Question Expediting through levels

I am a relatively new kid to the right hand seat and was wondering if someone in the ATC forum could please tell me the following answers?
When ATC request an aircraft to expedite through a level in a climb or descent, I seem to remember that you are at the latest expected to give a good rate of 1000ft before and after the requested level, thus giving a minimum of 2000ft where the rate would be higher than normal.
Personally in a climb I aim to increase my rate 2000ft before and ease it off again 1000ft after passing the requested expedite level.
It may seem an anal type of question, however there seems to be a lot of Capt who seem to think that you have to give a good rate all the way up to your assigned level, the problem being of course the A/C just plain runs out of steam at the higher levels if you try to give a good rate all the way from lower levels, especially when the A/C hasnt had time to accelerate properly.
We also have the added disadvantage where the A/C has a fairly restrictive speed schedule at lower levels until 10000ft.
So speed management is essential in some cases if you are not to be caught out if there is a relatively long climb to the requested expedite level especially at higher weights and lower speeds.
So what are the reqiurements as far as expediting through a level that ATC expect to be complied with?

Also I have asked and got lots of varying answers to the radar vectoring charts in the Racal Approach plate manuals.
Places like Glasgow for instance, arivals from the south are quite often given descents slightly lower than Sector MSA when outside the 10nm radius from the Field for the corresponding approach plate.
A quick cross check with the Radar Vectoring chart confirms that the controller is indeed working to the lower alt that is printed on that chart.
The problem is that there is almost no info what so ever of horizontal distance out from the field where these alt are safe to descend to.
On many Radar Vector plates there are small isolated areas quite often published that require a higher MDA to immediate surrounding areas on the Radar Vec Chart, but there is in almost all cases no quick and easy way of telling out to what distance from the field.
Considering that ultimately we pilots are always the ones that are responsible, does anyone know why the distances are not annotated on the plates...guess this maybe a question for Racal?
Seems a bit silly not to provide this info as I consider it important if you are to remain as situationally aware as possible? Maybe I am missing a point here? <img src="confused.gif" border="0">
Hap Hazard is offline  
Old 2nd Jan 2002, 00:15
  #2 (permalink)  
 
Join Date: Oct 1999
Location: Anywhere
Posts: 2,212
Likes: 0
Received 0 Likes on 0 Posts
Cool

Saab

I'm with your Captains on this. If I say expedite through a level it means I want you through that level ASAP, not normal rate just before it and then quickly through. This is to either get you on track once passed someone blocking your level or get you through the level of a possible conflict - if you don't haul a**e you then become a conflict.

As for the RVA charts. If it is known what obstruction the SSA is based on, and it is seen on radar that you are past that obstruction then there is nothing to prevent the controller descending you further (providing it is not less than 1000' above any other relevant obstructions on your track).

CM
Chilli Monster is offline  
Old 2nd Jan 2002, 01:48
  #3 (permalink)  
 
Join Date: Feb 2001
Location: Hants, UK
Posts: 1,064
Likes: 0
Received 0 Likes on 0 Posts
Post

Can't comment on the RVA charts, but with regard to the use of 'Expedite' I would concur it means: "Expedite all the way from your present level until you are through the level specified". As for what that means, I worry sometimes that people use it on an A340 for example, when the difference between normal and expedited rate does not seem to be very much! Often I will find out what sort of ROC/ROD you can manage to a certain level and then use that, or specify one which meets my needs.

Remember that if you are being asked to expedite, it is probably to help ensure separation against crossing traffic. We often phrase it in terms of a ROC/ROD because that is instantly recognisable, but what we actually mean or want is your best ANGLE of climb or descent (i.e. greatest height change for least distance travelled). It is up to you how you achieve that. Also I try not to give huge ranges to expedite because of the problem you mention of speed ranges etc (eg a/c passing FL210: "Climb FL370, expedite!"). Others do not..
eyeinthesky is offline  
Old 3rd Jan 2002, 00:04
  #4 (permalink)  
 
Join Date: Mar 2001
Location: Belgium
Age: 48
Posts: 40
Likes: 0
Received 0 Likes on 0 Posts
Cool

I must agree with eyeinthesky. It is always best to ask the pilot what ROC/ROD he/she can manage, and then work from there.
I also think "expedite" should not be used to separate two a/c. When the resulting ROC/ROD is not what you had in mind, you will still end up with a loss of separation (and be blamed). A specified ROC/ROD assures your separation and if the pilot can not comply, he/she should tell you, and you can change the plan. If he/she fails to comply without telling you, that's just him/she being unprofessional and dangerous.
ive348 is offline  
Old 3rd Jan 2002, 00:46
  #5 (permalink)  
Thread Starter
 
Join Date: Jul 2000
Location: Red Feather Club
Posts: 108
Likes: 0
Received 0 Likes on 0 Posts
Cool

Thanks for the info guys, at least I now know what you expect to see from us and will give the best rate for whatever config speed/weight and let you know...
Hap Hazard is offline  
Old 3rd Jan 2002, 16:12
  #6 (permalink)  

Mostly Harmless
 
Join Date: Nov 1999
Location: Oz (cold & wet bit)
Posts: 457
Likes: 0
Received 0 Likes on 0 Posts
Red face

I wince when I hear "expedite", to me it means an ATC has seen a problem but can't be bothered doing anything to actively fix it.

Can also mean an ATC is unwilling to use those horrible words "traffic, 10 O'clock, fo..., um, five miles" and is hoping he will come out of a situation without a hand falling on his shoulder...

To be fair, I have seen it used in situations where the second of two climbing aircraft is faster, and asking him to expedite stops the closing.
karrank is offline  
Old 3rd Jan 2002, 20:59
  #7 (permalink)  
 
Join Date: Feb 2000
Location: solent-on-sea
Posts: 443
Likes: 0
Received 0 Likes on 0 Posts
Question

karrank, thanks for the vote of confidence! I use expedite to make things happen quicker which usually means planes get where they're going sooner. Didn't realise it was because I was being lazy or dangerous...
Not Long Now is offline  
Old 4th Jan 2002, 03:37
  #8 (permalink)  
 
Join Date: Jul 2001
Location: Fort Worth ARTCC ZFW
Posts: 1,155
Likes: 0
Received 0 Likes on 0 Posts
Cool

Kranky;

Actually MOST of us use the expedite word so that flight crews don't have to level and stay there for a long time. In other words, we are trying to HELP them. It's no skin off my nose if a pilot doesn't want to do it as long as they tell me. That way we can leave them level...
Scott Voigt is offline  
Old 5th Jan 2002, 14:07
  #9 (permalink)  
 
Join Date: Apr 2001
Location: Adrift upon the tides of fate
Posts: 1,840
Likes: 0
Received 0 Likes on 0 Posts
Post

It IS safer to stop them off. But so is using 10 miles instead of 5. In busy airspace the line between safety and expedition is pushed closer to expedition. Otherwise the conflicts created by stopping climbs jams up the airspace quickly.
ferris is offline  
Old 6th Jan 2002, 11:07
  #10 (permalink)  
 
Join Date: May 2001
Location: UAE
Age: 63
Posts: 516
Likes: 0
Received 0 Likes on 0 Posts
Wink

Sorry Karrank....
"Expedite" gets them to their levels quicker...some of us don't have time or room to hold everybody at "safe" interim levels.
It pains me to do it but I have to agree with Ferris.... and it's no fun having 30 or more on vectors..... <img src="eek.gif" border="0">

To me, expedite means max rate(not best rate) of climb til past the level specified...just my 100 baisas worth.
divingduck is offline  
Old 6th Jan 2002, 13:23
  #11 (permalink)  
 
Join Date: Oct 2000
Location: Berkshire, UK
Age: 79
Posts: 8,268
Likes: 0
Received 0 Likes on 0 Posts
Post

Karrank.. If "expedite" makes you wince you've obviously never worked in a busy place! A good example from London is during the early morning peak into Heathrow (6-7am). We often use two runways and it means traffic will often have to cross one ILS to reach the other. Using min radar sep, or visual separation, we can get below Vortex sep... but pilots are great ones for dawdling down slowly so we sometimes have to ask them to expedite descent so we can drop down on top for the other runway. No loss of separation pending.. no need to wince.. just standard operating in a busy TMA.
HEATHROW DIRECTOR is offline  
Old 6th Jan 2002, 23:06
  #12 (permalink)  
 
Join Date: Jul 2001
Location: Fort Worth ARTCC ZFW
Posts: 1,155
Likes: 0
Received 0 Likes on 0 Posts
Cool

Yeah, one way to not have to use the term expedite so much is to have flight crews come down like it was their idea and not ours &lt;G&gt;.

I have been amazed at how many times I have been on a flight deck when ATC asked for an expedite and heard it rogered and then the crew did NOTHING! &lt;sigh&gt;

regards

Scott
Scott Voigt is offline  
Old 9th Jan 2002, 15:51
  #13 (permalink)  
 
Join Date: Feb 2001
Location: Back in land of tiny cabbages
Posts: 43
Likes: 0
Received 0 Likes on 0 Posts
Cool

Have to agree with karrank on this one.

Expedite means you are not in control and couldn't be bothered to work out the rate of climb or descent needed.

It doesn't mean anything to the pilots and means nothing to the investigation board.

Either give a specific rate, vector or even simply monitor but don't fudge it with "expedite"

That's my bit for the year!
ItchyFeet2 is offline  
Old 9th Jan 2002, 16:10
  #14 (permalink)  
 
Join Date: Oct 1999
Location: Anywhere
Posts: 2,212
Likes: 0
Received 0 Likes on 0 Posts
Post

IF2

You can tell you've never worked outside CAS <img src="rolleyes.gif" border="0">

CM
Chilli Monster is offline  
Old 9th Jan 2002, 16:51
  #15 (permalink)  
 
Join Date: Oct 1999
Location: UK
Posts: 17
Likes: 0
Received 0 Likes on 0 Posts
Red face

. . . or in the real world.

Sorry, IF2, don't have time for all these mental calculations, otherwise the six conflicts I'm worry about would have happened. Expedite means get a move on, use your commonsense.

As for 'monitor the situation', sorry, frowned upon, been too many incidents in the past where a situatiomn has been allowed to develop with the controller 'monitoring it'. He gets distracted and the incident happens. And that does means something to the investigation board.
Special VFR is offline  
Old 9th Jan 2002, 17:49
  #16 (permalink)  
 
Join Date: Dec 2001
Location: EDUU
Posts: 34
Likes: 0
Received 0 Likes on 0 Posts
Cool

I tend to agree with Special VFR but I think the other side is not completely wrong. Simply saying "expedite" means nothing. We give a limit to it; e.g. "expedite climb until passing FL..." to give the pilots a clue when they will be out of trouble so it is theirs to hurry or not.
Ainīt that fair?
romeowiz is offline  
Old 9th Jan 2002, 23:19
  #17 (permalink)  
 
Join Date: Aug 2001
Location: Muppetsville
Posts: 20
Likes: 0
Received 0 Likes on 0 Posts
Cool

Ok here's my 2p's worth

Anyone asking for expediates at levels such as 340 etc Bono deserves alot more than sweaty palms!
Plain stupidty that if you ask me we all know at those levels its useless! 2000ft from a requested level up there is hardly a penalty

However at the lower levels in a say a TM type enviroment it does have its place, its not because we have got it wrong, we (ATCO's) are trying to help you guy's (PILOT's) out, if you are say flying a 737, say LL-CC and there is maybe traffic FL90 15-20 miles ahead its a pretty good bet we will get a very good rate of climb if we ask for an expedite through FL100(particularly as we will have been watching your initial rate of climb of the deck! A 747 going to KLAX maybe not!
If you guys (pilots) are telling us (controllers) that you would rather stay at say 6000ft for 15 miles further than is absolutely necessary because you don't like hearing expedite...fine by me...BUT IF THAT IS SO STOP BUGGING US WITH CONTINUAL "passing 135 for 140" calls etc!!!


So make yor views known low levels for alot longer and headings all over the sky, or the odd expedite thrown in and up towards your requested levels sooner.
Contact London 131.12 is offline  
Old 10th Jan 2002, 15:03
  #18 (permalink)  
 
Join Date: Nov 2000
Location: Greystation
Posts: 1,086
Likes: 0
Received 0 Likes on 0 Posts
Post

I agree with CL131.12 that high level expedites is almost useless and shouldn't be used. However, at lower levels is an extremely useful tool. I use it when I have assessed 2 a/c should miss, but not by much (ie getting the 5 miles at least, normally 8 or so), so 'get your arse through FL~~~' doubles the safety by increasing the range of the miss. <img src="cool.gif" border="0"> <img src="cool.gif" border="0">

As for those who say expedite means nothing to them, our MATS Part 1 (yes, I've finally found it and dusted it off!!!) Phraseology section states -
'Expedite Climb/Descent' To require a pilot to climb/descend at best rate
If its in ours, then I would say it has to be in the AIP or other docs with phraseology, anyone got a reference????

[ 10 January 2002: Message edited by: 5milesbaby ]</p>
5milesbaby is offline  
Old 10th Jan 2002, 15:35
  #19 (permalink)  
 
Join Date: Dec 2001
Location: EDUU
Posts: 34
Likes: 0
Received 0 Likes on 0 Posts
Wink

5milesbaby, I dusted one off, too.(AIP Germany)

EXPEDITE CLIMB / DESCENT UNTIL PASSING (level):
If climb/descent need to be started immediately after receipt of clearance.

Thatīs nothing but "get it going", isīnt it? Nothing to the rate but "commence action now".
romeowiz is offline  
Old 10th Jan 2002, 16:44
  #20 (permalink)  
 
Join Date: Jul 2000
Location: My views - Not my employer!
Posts: 1,032
Likes: 0
Received 0 Likes on 0 Posts
Post

Heathrow Director - Normally descending slowly to achieve the Cont. Descent App that BAA loves us to do. If you told us to get down for wake, believe me we would.
Cough is offline  


Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.