Log in

View Full Version : QEC 777 Roller Engine chg


Wanchai Butterfly
8th Jan 2003, 14:32
Come on all you 777 experts, what downtime does it take your airline to carryout a normal 777 engine chg.

Preferably at your own maintenance facility including post ground runs.

Also standard for A340 would also be required.

cirrus01
10th Jan 2003, 13:12
Would say that average for Big Air is around 18-24 hours on the Trent 777s. It depends on so many factors, not least the availibility of enough experienced Engineers .
Usually no Hi-pwr runs required as engines come pre-tested from RR.

Easier than the GE90 !

H721
11th Jan 2003, 08:58
I guess Tech 2 does less than that. :D

gas path
12th Jan 2003, 08:20
Wanchai Butterfly

Do you bootstrap or Cobra for your E/C?
Just interested!!!!

sevenforeseven
3rd Feb 2003, 08:33
a340-300 engine change takes about 12 hrs,using the good old bootstrap method,very easy to do,engine usually requires idle power check start as they come pre tested.Fuel line Hyd line and about 5 other disconnects not a bad job at all,which is all the better because the amount of engine changes you do on these aircraft sure builds up your experiance.