ptithomme
12th Jul 2012, 08:55
Hi,
Small question about AC2 failure and the associated electrical reconfiguration:
Is DC ESS supplied by DC1 via DC BAT ? (no change compared to the normal configuration)
Or, is DC ESS supplied by AC ESS via ESS TR ? (similar to the AC BUS 1 Fault)
I would say it's the second option, but I can't find the answer in my documentation...
Any idea ?
Small question about AC2 failure and the associated electrical reconfiguration:
Is DC ESS supplied by DC1 via DC BAT ? (no change compared to the normal configuration)
Or, is DC ESS supplied by AC ESS via ESS TR ? (similar to the AC BUS 1 Fault)
I would say it's the second option, but I can't find the answer in my documentation...
Any idea ?