PintofT
9th Dec 2009, 17:19
Horizontal separation - Independent parallel approaches. A minimum radar separation shall be provided until aircraft are established inbound on the ILS localizer course and/or MLS final approach track. This minimum is, when independent parallel approaches are being conducted:;
1, 2, 3 or 5nm?
The answer given is 3 (although it could be as low as 2.5nm).
I thought that the 2.5nm separation could only be applied once the two aircraft are established on the same localiser not beforehand as the question states.
Clarification would be great. :confused:
Many thanks!
1, 2, 3 or 5nm?
The answer given is 3 (although it could be as low as 2.5nm).
I thought that the 2.5nm separation could only be applied once the two aircraft are established on the same localiser not beforehand as the question states.
Clarification would be great. :confused:
Many thanks!