Hello Ladies and Gents, I have a question. When does RVR reporting start?
Spitoon
12th Feb 2009, 09:06
Annex 3 is the reference. It says4.6.3.3 The runway visual range...shall be reported in metres throughout periods when either the visibility or the runway visual range is less than 1 500 m.