PDA

View Full Version : Building work set to start at LTN


LTN man
28th Mar 2002, 01:31
The view from stands 3 to 9L is set to change as a new enclosed walkway is to be built at Luton. The walkway will be accessed from the first floor domestic lounge which will lose its domestic status. The walkway will extend from the old Duty Free hexagonal building and will end by stand 9L. Below the walkway 5 holding lounges will be built. Passengers will still have to walk across a short length of tarmac to reach the aircraft, as no air bridges will be built. Stands 1 and 2 will get a ground floor covered walkway that will link into the main walkway via a staircase. The walkway will be finished in a similar material to the new terminal building. Work will start in the next week or two.. .. .FBO Signature are to build a new hangar that will hold 5 x 737’s in the North West Corner. The hangar will replace the existing Signature hangar that is part leased to Scott Airways and will extend to Honeywell’s hanger. Luton Airport’s Admin building Percival House will also be demolished to make way for the hangar.

loggerhead
28th Mar 2002, 03:20
LTN MAN, is there a second floor to the new terminal? and is it (if there is one) going to be used. And will they add air bridges to it?