Originally Posted by
ANTIPHOLUS
The AHK 300-600’s need replacing. That’s the most likely scenario given that they’re old, hybrids, non RNP capable and spares support becoming difficult.
Those aircraft will be replaced by CX -400 freighters (all of them) and possibly the -8 down track a little.