PPRuNe Forums - View Single Post - Approach to Tower Handover RT
View Single Post
Old 23rd Sep 2017, 12:53
  #1 (permalink)  
Prop Job
 
Join Date: Mar 2007
Location: South Africa
Age: 38
Posts: 50
Likes: 0
Received 0 Likes on 0 Posts
Approach to Tower Handover RT

Good day,

As the subject states my question relates to the proper RT when being handed over by an approach controller to tower, specifically in a radar controlled environment.

Suppose the airport is using two parallel runways and you are still under radar control when the handover takes place. When you make contact with the Tower is it proper to include altitude and position (runway established on)? Is it sufficient to only make contact with the tower since you are still under radar control?

From what I can see in Jeppesen they state that you must include designation of station being called, callsign, position and "additional elements", but they do not specify if all elements are required at all times.

Thanks!

Prop Job
Prop Job is offline